Jump to content

NASA Airs Coverage of Space Station Research, Development Conference


NASA

Recommended Posts

  • Publishers

rssImage-00b9b372685721506d4a719eaabd0791.jpeg

NASA will highlight groundbreaking discoveries, benefits for humanity, and how the agency and its commercial and international partners are maximizing research and development aboard the International Space Station at the 12th annual International Space Station Research and Development Conference.

View the full article

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By Amazing Space
      Space Shuttle Discovery - Slow Motion Launch
    • By NASA
      (Left to right) Roscosmos Cosmonaut Alexander Grebenkin and NASA Astronauts Michael Barratt, Matthew Dominick, and Jeanette Epps pose for a photo during their Crew Equipment Interface Test at NASA’s Kennedy Space Center in Florida. The goal of the training is to rehearse launch day activities and get a close look at the spacecraft that will take them to the International Space Station. Credit: SpaceX NASA will provide coverage of the upcoming prelaunch and launch activities for the agency’s SpaceX Crew-8 mission with astronauts to the International Space Station.
      The launch is targeted for 12:04 a.m. EST, Friday, March 1, from Launch Complex 39A at NASA’s Kennedy Space Center in Florida. The targeted docking time is about 7 a.m. on Saturday, March 2.
      Crew arrival will be available on Kennedy’s streaming channels including YouTube and X. Coverage of launch, the postlaunch news conference, and docking will be available on NASA+, NASA Television, the NASA app, YouTube, and the agency’s website. NASA also will host an audio-only post-Flight Readiness Review news teleconference. Learn how to stream NASA TV through a variety of platforms including social media.

      The Crew-8 launch will carry NASA astronauts Matthew Dominick, Michael Barratt, and Jeanette Epps, as well as Roscosmos cosmonaut Alexander Grebenkin.

      As part of the agency’s Commercial Crew Program, the mission marks the eighth crew rotation mission and the ninth human spaceflight mission for NASA to the space station supported by a SpaceX Dragon spacecraft since 2020. Endeavour is the name of this Dragon spacecraft.

      The deadline for media accreditation for in-person coverage of this launch has passed. The agency’s media credentialing policy is available online. For questions about media accreditation, please email: ksc-media-accreditat@mail.nasa.gov.
      NASA’s mission coverage is as follows (all times Eastern and subject to change based on real-time operations):

      Sunday, Feb. 25:
      2 p.m. – Crew arrival media event at Kennedy streaming on the center’s social accounts with the following participants:
      Jennifer Kunz, associate director, technical, NASA Kennedy Dana Hutcherson, deputy program manager, Commercial Crew Program, NASA Kennedy NASA astronaut Matthew Dominick NASA astronaut Michael Barratt NASA astronaut Jeanette Epps Roscosmos cosmonaut Alexander Grebenkin The event is limited to in-person media only. Follow Commercial Crew and Kennedy Space Center for the latest arrival updates.
      6 p.m. (approximately) – Flight Readiness Review media teleconference (no earlier than one hour after completion of the Flight Readiness Review) with the following participants:
      Ken Bowersox, associate administrator, Space Operations Mission Directorate, NASA Headquarters Steve Stich, manager, Commercial Crew Program, NASA Kennedy Joel Montalbano, manager, International Space Station Program, NASA Johnson William Gerstenmaier, vice president, Build and Flight Reliability, SpaceX Eric van der Wal, Houston office team leader, ESA (European Space Agency) Takayoshi Nishikawa, director, JAXA (Japan Aerospace Exploration Agency) Houston Office Media may ask questions via phone only. For the dial-in number and passcode, please contact the Kennedy newsroom no later than 3 p.m. Friday, Feb. 23, at: ksc-newsroom@mail.nasa.gov.
      Wednesday, Feb. 28:
      9:15 a.m. – NASA Social panel live stream event at Kennedy with the following participants:
      NASA Associate Administrator Jim Free Carla Koch, mission manager, Commercial Crew Program, NASA Kennedy Jennifer Buchli, chief scientist, International Space Station Program, NASA Johnson Kristin Fabre, deputy chief scientist, Human Research Program, NASA Johnson Members of the public may ask questions online by posting questions to the YouTube, Facebook, and X livestreams using #AskNASA.
      10:30 a.m. – NASA Administrator briefing from Kennedy with the following participants:
      NASA Administrator Bill Nelson NASA Associate Administrator Jim Free Joel Montalbano, manager, International Space Station Program Steve Stich, manager, Commercial Crew Program Media may ask questions in person and via phone. Limited auditorium space will be available for in-person participation. For the dial-in number and passcode, media should  contact the Kennedy newsroom no later than 9:30 a.m. Wednesday, Feb. 28, at ksc-newsroom@mail.nasa.gov.
      12:30 p.m. – One-on-one media interviews at Kennedy with various mission subject matter experts. Sign-up information will be emailed to media accredited to attend this launch in person.
      Thursday, Feb. 29:
      8 p.m. – NASA TV launch coverage begins
      Friday, March 1:
      12:04 a.m. – Launch
      Following conclusion of launch and ascent coverage, NASA coverage will continue with audio only, with full coverage resuming at the start of the rendezvous and docking broadcast. The audio link and details will be available nearer to the mission.
      NASA Television will resume continuous mission coverage prior to docking and continue through hatch open and the welcome ceremony. For NASA TV downlink information, schedules, and links to streaming video, visit:
      https://www.nasa.gov/nasatv/
      2 a.m. (approximately) – Postlaunch news conference on NASA TV
      Steve Stich, manager, Commercial Crew Program Joel Montalbano, manager, International Space Station Program Sarah Walker, director, Dragon Mission Management, SpaceX Media may ask questions in person and via phone. Limited auditorium space will be available for in-person participation. For the dial-in number and passcode, please contact the Kennedy newsroom no later than 12 a.m. Friday, March 1, at ksc-newsroom@mail.nasa.gov.
      Saturday, March 2:
      5 a.m. – NASA TV arrival coverage begins (or about two hours prior to docking)
      7 a.m. – Targeted docking to the forward-facing port of the station’s Harmony module
      Hatch opening will be approximately one-hour-and-forty-five minutes after docking followed by welcome remarks aboard station. All times are estimates and could be adjusted based on operations after launch. Follow the space station blog for the most up-to-date operations information.
      Audio Only Coverage
      Audio only of the news conferences and launch coverage will be carried on the NASA “V” circuits, which may be accessed by dialing 321-867-1220, -1240 or -7135. On launch day, “mission audio,” countdown activities without NASA TV launch commentary, will be carried on 321-867-7135.
      Launch audio also will be available on Launch Information Service and Amateur Television System’s VHF radio frequency 146.940 MHz and KSC Amateur Radio Club’s UHF radio frequency 444.925 MHz, FM mode, heard within Brevard County on the Space Coast.
      Live Video Coverage Prior to Launch
      NASA will provide a live video feed of Launch Complex 39A approximately 48 hours prior to the planned liftoff of the Crew-8 mission. Pending unlikely technical issues, the feed will be uninterrupted until the prelaunch broadcast begins on NASA TV, approximately four hours prior to launch. Once the feed is live, find it here: 
      http://youtube.com/kscnewsroom.
      NASA Website Launch Coverage
      Launch day coverage of NASA’s SpaceX Crew-8 mission will be available on the agency’s website. Coverage will include live streaming and blog updates beginning no earlier than 8 p.m. Feb. 29, as the countdown milestones occur. On-demand streaming video and photos of the launch will be available shortly after liftoff.
      For questions about countdown coverage, contact the Kennedy newsroom at 321-867-2468. Follow countdown coverage on the commercial crew or Crew-8 blog.
      Attend the Launch Virtually
      Members of the public can register to attend this launch virtually. NASA’s virtual guest program for this mission also includes curated launch resources, notifications about related opportunities or changes, and a stamp for the NASA virtual guest passport following a successful launch.
      Watch and Engage on Social Media
      Let people know you’re following the mission on X, Facebook, and Instagram by using the hashtags #Crew8 and #NASASocial. You can also stay connected by following and tagging these accounts:
      X: @NASA, @NASAKennedy, @NASASocial, @Space_Station, @ISS_Research, @ISS National Lab, @SpaceX, @Commercial_Crew
      Facebook: NASA, NASAKennedy, ISS, ISS National Lab
      Instagram: @NASA, @NASAKennedy, @ISS, @ISSNationalLab, @SpaceX
      Coverage en Espanol
      Did you know NASA has a Spanish section called NASA en Espanol? Make sure to check out NASA en Espanol on X, Instagram, Facebook, and YouTube for more coverage on Crew-8.
      Para obtener información sobre cobertura en español en el Centro Espacial Kennedy o si desea solicitar entrevistas en español, comuníquese con Antonia Jaramillo: 321-501-8425;antonia.jaramillobotero@nasa.gov; o Messod Bendayan: 256-930-1371; messod.c.bendayan@nasa.gov.
      NASA’s Commercial Crew Program has delivered on its goal of safe, reliable, and cost-effective transportation to and from the International Space Station from the United States through a partnership with American private industry. This partnership is changing the arc of human spaceflight history by opening access to low Earth orbit and the International Space Station to more people, more science, and more commercial opportunities. The space station remains the springboard to NASA’s next great leap in space exploration, including future missions to the Moon and, eventually, to Mars.
      For NASA’s launch blog and more information about the mission, visit:
      https://www.nasa.gov/commercialcrew
      -end-
      Joshua Finch / Claire O’Shea
      Headquarters, Washington
      202-358-1100
      joshua.a.finch@nasa.gov / claire.a.o’shea@nasa.gov
      Steven Siceloff / Danielle Sempsrott
      Kennedy Space Center, Florida
      321-867-2468
      steven.p.siceloff@nasa.gov / danielle.c.sempsrott@nasa.gov
      Leah Cheshier
      Johnson Space Center, Houston
      281-483-5111
      leah.d.cheshier@nasa.gov
      Share
      Details
      Last Updated Feb 23, 2024 LocationNASA Headquarters Related Terms
      Humans in Space Astronauts Commercial Space International Space Station (ISS) ISS Research Jeanette J. Epps Matthew Dominick NASA Headquarters View the full article
    • By NASA
      NASA and Intuitive Machines will host a televised news conference at 5 p.m. EST Friday, Feb. 23, to detail the Odysseus lander’s historic soft Moon landing.
      With the last-minute assistance of a NASA precision landing technology, the first CLPS, or Commercial Lunar Payload Services, mission carrying the agency’s science and technology demonstrations successfully landed on the Moon at 6:23 p.m. on Feb. 22.
      This mission is the first U.S. soft landing on the Moon in more than 50 years. Flight controllers are communicating and commanding the lander, which is solar charging and has good telemetry.
      The news conference will air on NASA+, NASA Television, and the agency’s website. Learn how to stream NASA TV on a variety of platforms including social media.
      Participants in the news conference include:
      Joel Kearns, deputy associate administrator for Exploration, Science Mission Directorate, NASA Headquarters in Washington Prasun Desai, deputy associate administrator, Space Technology Mission Directorate at NASA Headquarters Steve Altemus, chief executive officer and co-founder, Intuitive Machines Tim Crain, chief technology officer and co-founder, Intuitive Machines This event is virtual only. To ask questions during the news conference, media must RSVP to the NASA newsroom no later than two hours before the start of the call to: hq-media@mail.nasa.gov.
      For more information about the agency’s Commercial Lunar Payload Services initiative, visit: 
      https://www.nasa.gov/clps
      -end-
      Cheryl Warner / Karen Fox
      Headquarters, Washington
      202-358-1100
      cheryl.m.warner@nasa.gov / karen.c.fox@nasa.gov
      Nilufar Ramji / Laura Sorto
      Johnson Space Center, Houston 
      281-483-5111 
      nilufar.ramji@nasa.gov / laura.g.sorto@nasa.gov
      Josh Marshall
      Intuitive Machines, Houston
      jmarshall@intuitivemachines.com
      Share
      Details
      Last Updated Feb 23, 2024 LocationNASA Headquarters Related Terms
      Missions Artemis Commercial Lunar Payload Services (CLPS) View the full article
    • By NASA
      4 min read
      Preparations for Next Moonwalk Simulations Underway (and Underwater)
      NASA recently completed a series of tests to reduce risks prior to Phase 2 of its Quesst mission, which will test the ability of the X-59 experimental aircraft to make sonic booms quieter. Credits: NASA/Steve Parcel NASA’s X-59 experimental aircraft is unique – it’s designed to fly faster than the speed of sound, but without causing a loud sonic boom. To confirm the X-59’s ability to fly supersonic while only producing quiet sonic “thumps,” NASA needs to be able to record these sounds from the ground. The agency recently completed tests aimed at understanding equipment and procedures needed to make those recordings.
      NASA’s Carpet Determination In Entirety Measurements (CarpetDIEM) flights examined the quality and ruggedness of a new generation of ground recording systems, focusing on how to deploy the systems for X-59 testing, and retrieve the data they collect. In all, researchers set up 10 microphone stations over a 30-mile stretch of desert near NASA’s Armstrong Flight Research Center in Edwards, California.
      “We’re trying to answer questions like how many people does it take to go out and service these instruments on a daily basis, how to get the data back, how many vehicles are needed – all those sorts of things on how we operate,” said Forrest Carpenter, principal investigator for the third flight series, known as CarpetDIEM III. “We’re kind of learning how to dance now so that when we get to the big dance, we’re ready to go.”
      The X-59 itself is not yet flying, so using an F-15 and an F-18 from NASA Armstrong, the CarpetDIEM III testing involved 20 supersonic passes with speeds ranging from Mach 1.15 to Mach 1.4, at altitudes ranging from 40,000 to 53,000 feet. Three of the passes involved an F-18 conducting a special inverted dive maneuver to simulate a quiet sonic boom, with one getting as quiet as 67 perceived level decibels, a measure of the perceived noisiness of the jet for an observer on the ground.
      Aerospace engineer Larry Cliatt, Quesst Phase 2 sub-project manager and technical lead for the acoustic validation phase of the Quesst mission, sets up a ground recording system in the California desert. The Quesst mission recently completed testing of operations and equipment to be used in recording the sonic thumps of the X-59. The testing was the third phase of Carpet Determination in Entirety Measurements flights, called CarpetDIEM for short. An F-15 and an F-18 from NASA’s Armstrong Flight Research Center in Edwards, California, created sonic booms, both loud and soft, to verify the operations of ground recording systems spread out across 30 miles of open desert.NASA/Steve Freeman “We expect the X-59 sonic thump to be as low as about 75 perceived loudness decibels,” said Larry Cliatt, sub-project manager for the Quesst acoustic validation phase. “That is a lot quieter than the Concord, which was over 100 perceived loudness decibels.”
      In order to measure these very quiet sonic thumps, the ground recording systems used in the CarpetDIEM flights were calibrated to measure as low as about 50 perceived loudness decibels – the equivalent to being in the room with a running refrigerator.
      CarpetDIEM III also validated the use of Automatic Dependent Surveillance-Broadcast, an existing technology flown on all commercial aircraft and most private aircraft to report speed and position. This system triggers the ground recording systems to begin recording.
      “We can’t have 70 different people at every single instrumentation box,” Cliatt said. “We had to find a way to automate that process.”
      Dr. Forrest Carpenter, left, principal investigator for the third phase of CarpetDIEM, Carpet Determination in Entirety Measurements flights, monitors a test from one of the control rooms at NASA’s Armstrong Flight Research Center in Edwards, California. Next to Carpenter is Brian Strovers, chief engineer for Commercial Supersonic Technology. The third phase of CarpetDIEM tested logistics and upgraded ground recording systems in preparation for the acoustic validation phase of the Quesst mission.NASA/Steve Freeman The recording systems are designed to withstand the desert elements, the extreme heat of summer and the cold of winter, and to be resistant to damage from wildlife, such as chewing by rodents, coyotes, and foxes.
      “When we get to Phase 2 of the Quesst mission, we expect to be doing these recordings of sonic thumps for up to nine months,” Cliatt said. “We need to be able to have instrumentation and operations that can facilitate such a long deployment.”
      Another lesson learned – setup time for the recording stations was just under an hour, compared to the anticipated 2 1/2 hours. Given the performance of the systems, the team will assess whether they need to visit all the sites every day of Phase 2 testing.
      The team also learned about the coordination and documentation processes needed for such research, both with internal organizations, such as NASA Armstrong’s Environmental and Safety offices, and with outside parties including:
      The U.S. Bureau of Land Management, which gave approval to use public lands for the testing Law enforcement, which helped secure the test site The Federal Aviation Administration, which gave approval for NASA jets to fly outside the Edwards Air Force Base restricted airspace in order to conduct a portion of the CarpetDIEM tests To prepare for Quesst Phase 2, researchers expect to conduct practice sessions in 2024, incorporating all the lessons learned and best practices from all three phases of CarpetDIEM.
      Share
      Details
      Last Updated Feb 22, 2024 EditorDede DiniusContactJim Skeenjames.r.skeen@nasa.govLocationArmstrong Flight Research Center Related Terms
      Armstrong Flight Research Center Advanced Air Vehicles Program Aeronautics Aeronautics Research Mission Directorate Aeronautics Technology Commercial Supersonic Technology Low Boom Flight Demonstrator Quesst (X-59) Quesst: The Flights Supersonic Flight Explore More
      5 min read Math, Mentorship, Motherhood: Behind the Scenes with NASA Engineers
      Article 4 hours ago 4 min read NASA Center Boosted YF-12 Supersonic Engine Research
      Article 9 hours ago 4 min read NASA Selects University Teams to Explore Innovative Aeronautical Research
      Article 2 days ago Keep Exploring Discover More Topics From NASA
      Armstrong Flight Research Center
      Quesst: The Mission
      Armstrong Aeronautics Projects
      NASA Aircraft
      View the full article
    • By NASA
      NASA has selected Sierra Lobo Inc. of Fremont, Ohio, to support spaceflight hardware design, development, testing, and operations at NASA’s Glenn Research Center in Cleveland. 
      The Space Flight Systems Development and Operations Contract III is a cost-plus-fixed-fee contract featuring a cost-plus-fixed-fee and firm-fixed-price indefinite-delivery/indefinite-quantity provision with a maximum potential value of approximately $282.1 million. The 90-day phase-in period is anticipated to begin on Tuesday, Feb. 27, followed by a three-year base period and two two-year option periods.
      The systems development and operations contract encompasses the development and delivery of technology development hardware and software, space flight hardware and software, ground support equipment, spares, as well as mission integration and operations, and sustaining engineering. The contractor will be responsible for the definition, design, development, analysis, fabrication, assembly, test, verification, delivery, and operation of space flight systems, associated support systems and equipment, and related ground activities, including research, science, and technology development and demonstrations.
      For information about NASA and other agency programs, visit:
      https://www.nasa.gov
      -end-
      Roxana Bardan
      Headquarters, Washington
      202-358-1600
      roxana.bardan@nasa.gov
      Jan Wittry
      Glenn Research Center, Cleveland
      216-433-5466
      Jan.m.wittry-1@nasa.gov
      Share
      Details
      Last Updated Feb 22, 2024 LocationNASA Headquarters Related Terms
      Glenn Research Center View the full article
  • Check out these Videos

×
×
  • Create New...