Jump to content

Space for climate: raising awareness ahead of COP26


Recommended Posts

Gorner Glacier, Switzerland

Ahead of the 26th UN Climate Change Conference of Parties (COP26), climate and energy ministers are coming together this week in Milan, Italy, to discuss the key political topics to be addressed at the upcoming global summit – taking place in early November in Glasgow.

ESA will be present at both the Pre-COP and COP26, highlighting the vital importance of observing our changing world from space and showing how satellite data play a critical role in underpinning climate policy.

View the full article

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By Space Force
      Col. Patrick took command of SPACEFOR-KOR from his previous assignment at Ramstein Air Base, Germany, he is a career space operations officer, with command experience at the squadron level and joint experience in both Germany and Belgium.

      View the full article
    • By NASA
      Move teams with NASA and Boeing, the SLS (Space Launch System) core stage lead contractor, position the massive rocket stage for NASA’s SLS rocket on special transporters to strategically guide the flight hardware the 1.3-mile distance from the factory floor onto the agency’s Pegasus barge on July 16. The core stage will be ferried to NASA’s Kennedy Space Center in Florida, where it will be integrated with other parts of the rocket that will power NASA’s Artemis II mission. Pegasus is maintained at NASA’s Michoud Assembly Facility. Credit: NASA NASA rolled out the SLS (Space Launch System) rocket’s core stage for the Artemis II test flight from its manufacturing facility in New Orleans on Tuesday for shipment to the agency’s spaceport in Florida. The rollout is key progress on the path to NASA’s first crewed mission to the Moon under the Artemis campaign.
      Using highly specialized transporters, engineers maneuvered the giant core stage from inside NASA’s Michoud Assembly Facility in New Orleans to the agency’s Pegasus barge. The barge will ferry the stage more than 900 miles to NASA’s Kennedy Space Center in Florida, where engineers will prepare it in the Vehicle Assembly Building for attachment to other rocket and Orion spacecraft elements.
      “With Artemis, we’ve set our sights on doing something big and incredibly complex that will inspire a new generation, advance our scientific endeavors, and move U.S. competitiveness forward,” said Catherine Koerner, associate administrator for NASA’s Exploration Systems Development Mission Directorate at NASA Headquarters in Washington. “The SLS rocket is a key component of our efforts to develop a long-term presence at the Moon.”
      Technicians moved the SLS rocket stage from inside NASA Michoud on the 55th anniversary of the launch of Apollo 11 on July 16, 1969. The move of the rocket stage for Artemis marks the first time since the Apollo Program that a fully assembled Moon rocket stage for a crewed mission rolled out from NASA Michoud.
      The SLS rocket’s core stage is the largest NASA has ever produced. At 212 feet tall, it consists of five major elements, including two huge propellant tanks that collectively hold more than 733,000 gallons of super-chilled liquid propellant to feed four RS-25 engines. During launch and flight, the stage will operate for just over eight minutes, producing more than 2 million pounds of thrust to propel four astronauts inside NASA’s Orion spacecraft toward the Moon.
      “The delivery of the SLS core stage for Artemis II to Kennedy Space Center signals a shift from manufacturing to launch readiness as teams continue to make progress on hardware for all major elements for future SLS rockets,” said John Honeycutt, SLS program manager at NASA’s Marshall Space Flight Center in Huntsville, Alabama. “We are motivated by the success of Artemis I and focused on working toward the first crewed flight under Artemis.”
      After arrival at NASA Kennedy, the stage will undergo additional outfitting inside the Vehicle Assembly Building. Engineers then will join it with the segments that form the rocket’s twin solid rocket boosters. Adapters for the Moon rocket that connect it to the Orion spacecraft will be shipped to NASA Kennedy this fall, while the interim cryogenic propulsion stage is already in Florida. Engineers continue to prepare Orion, already at Kennedy, and exploration ground systems for launch and flight.
      All major structures for every SLS core stage are fully manufactured at NASA Michoud. Inside the factory, core stages and future exploration upper stages for the next evolution of SLS, called the Block 1B configuration, currently are in various phases of production for Artemis III, IV, and V. Beginning with Artemis III, to better optimize space at Michoud, Boeing, the SLS core stage prime contractor, will use space at NASA Kennedy for final assembly and outfitting activities.
      Building, assembling, and transporting the SLS core stage is a collaborative effort for NASA, Boeing, and lead RS-25 engines contractor Aerojet Rocketdyne, an L3Harris Technologies company. All 10 NASA centers contribute to its development with more than 1,100 companies across the United States contributing to its production. 
      NASA is working to land the first woman, first person of color, and its first international partner astronaut on the Moon under Artemis. SLS is part of NASA’s backbone for deep space exploration, along with the Orion spacecraft, supporting ground systems, advanced spacesuits and rovers, the Gateway in orbit around the Moon, and commercial human landing systems. SLS is the only rocket that can send Orion, astronauts, and supplies to the Moon in a single launch.
      For more on NASA’s Artemis campaign, visit: 
      http://www.nasa.gov/artemis
      -end- 
      Madison Tuttle/Rachel Kraft
      Headquarters, Washington
      202-358-1600
      madison.e.tuttle@nasa.gov/rachel.h.kraft@nasa.gov
      Corinne Beckinger 
      Marshall Space Flight Center, Huntsville, Ala. 
      256-544-0034  
      corinne.m.beckinger@nasa.gov
      Share
      Details
      Last Updated Jul 16, 2024 LocationNASA Headquarters Related Terms
      Space Launch System (SLS) Artemis Artemis 2 Common Exploration Systems Development Division Exploration Systems Development Mission Directorate Marshall Space Flight Center Michoud Assembly Facility View the full article
    • By NASA
      The International Space Station is pictured from the SpaceX Crew Dragon Endeavour during a fly around of the orbiting lab that took place following its undocking from the Harmony module’s space-facing port on Nov. 8, 2021. NASA is planning for the future in low Earth orbit for science, research, and commercial opportunities as the agency and its international partners maximize the use of the International Space Station.
      As the agency fosters new commercial space stations, leadership from NASA and SpaceX will participate in a media teleconference at 2 p.m. EDT Wednesday, July 17, to discuss the company’s selection to develop and deliver the U.S. Deorbit Vehicle, which will safely move the International Space Station out of orbit and into a remote area of an ocean at the end of its operations.
      Audio of the teleconference will stream live on the agency’s website:
      https://www.nasa.gov/nasatv
      Participants include:
      Ken Bowersox, associate administrator, NASA’s Space Operations Mission Directorate Dana Weigel, manager, NASA’s International Space Station Program Sarah Walker, director, Dragon mission management, SpaceX Media interested in participating must contact the newsroom at NASA Johnson no later than one hour prior to the start of the call at 281-483-5111 or jsccommu@mail.nasa.gov. A copy of NASA’s media accreditation policy is online.
      As the agency transitions to commercially owned space destinations, it is crucial to prepare for the safe and responsible deorbit of the space station in a controlled manner after the end of its operational life in 2030.
      Read more about the agency’s International Space Station Deorbit Analysis Summary white paper.
      Learn more about space station operations at:
      https://www.nasa.gov/station
      -end-
      Josh Finch / Jimi Russell
      Headquarters, Washington
      202-358-1100
      joshua.a.finch@nasa.gov / james.j.russell@nasa.gov
      Sandra Jones
      Johnson Space Center, Houston
      281-483-5111
      sandra.p.jones@nasa.gov
      View the full article
    • By NASA
      NASA is turning to the 3D modeling experts in the community for ideas and designs to use or enhance the current state of modular robotic construction techniques. Robotic building of structures in space is an active area of research for NASA and might prove to be a path towards sustainable and scalable space exploration. This technology is essential for establishing critical long-term orbital and Lunar surface infrastructure including power/communication towers, research stations, radiation shielding for habitats, and more.
      Award: $2,000 in total prizes
      Open Date: July 15, 2024
      Close Date: September 9, 2024
      For more information, visit: https://grabcad.com/challenges/robotic-assembly-and-outfitting-for-nasa-space-missions
      View the full article
    • By NASA
      Credit: NASA The United States and Saudi Arabia signed a framework agreement that opens new possibilities for cooperation with NASA in areas such as space science, exploration, aeronautics, space operations, education, and Earth science.
      NASA Administrator Bill Nelson signed on behalf of the U.S., and CEO of the Saudi Space Agency Mohammed bin Saud Al-Tamimi signed on behalf of the Kingdom of Saudi Arabia.
      “Building on my visit to Saudi Arabia earlier this year, I look forward to strengthening our cooperation for the future of exploration,” said Nelson. “We are living in the golden era of exploration – one that is rooted in partnership. This new agreement outlines how we’ll work together, and explore together, for the benefit of humanity.” 
      Known as the “Framework Agreement Between the Government of the United States of America and the Government of The Kingdom of Saudi Arabia on Cooperation in Aeronautics and the Exploration and Use of Airspace and Outer Space for Peaceful Purposes,” it establishes the overall legal framework to facilitate and strengthen mutually beneficial collaboration between the two countries.
      “The agreement represents a turning point in the Kingdom’s journey towards building a strong and prosperous space sector,” said Saudi Space Agency Chairman Abdullah bin Amer Al-Swaha. “It reflects the Kingdom’s firm commitment to progress and innovation in the field of space, and its continuous efforts to enhance its position as an important partner on the global stage for space exploration and scientific discovery.” 
      The agreement also acknowledges the importance of the Artemis Accords, which Saudi Arabia signed in July 2022, for the transparent, safe, and responsible exploration of space. The commitments of the Artemis Accords, and efforts by the signatories to advance implementation of all its principles, support NASA’s Artemis campaign with its partners and other activities of the accords signatories.
      The signing comes two months after Nelson’s visit to Saudi Arabia, where he met with Saudi Space Agency and other senior officials to discuss future partnerships and civil space cooperation for the broader U.S. and Saudi Arabia relationship.
      In May 2023, two Saudi mission specialists, Ali Alqarni and Rayyanah Barnawi, were among a group of Axiom Mission-2 private astronauts who launched into orbit aboard a SpaceX Dragon from NASA’s Kennedy Space Center in Florida, highlighting international cooperation. The Axiom Space astronauts conducted scientific research, outreach, and commercial activities aboard the International Space Station.
      For more information about NASA’s international partnerships, visit:
      https://www.nasa.gov/oiir
      -end-
      Meira Bernstein / Elizabeth Shaw
      Headquarters, Washington
      202-358-1600
      meira.b.bernstein@nasa.gov / elizabeth.a.shaw@nasa.gov
      Share
      Details
      Last Updated Jul 16, 2024 LocationNASA Headquarters Related Terms
      Office of International and Interagency Relations (OIIR) Artemis Accords View the full article
  • Check out these Videos

×
×
  • Create New...