Jump to content

Department of Defense Guidance for Coronavirus Disease 2019 Vaccination Attestation and Screening Testing for Unvaccinated Personnel


Space Force
 Share

Recommended Posts

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Similar Topics

    • By European Space Agency
      Image: Hall of mirrors for Proba-3 laser testing View the full article
    • By European Space Agency
      Video: 00:05:17 At the Thales Alenia Space test facility in Cannes, France, the massive door of the thermal vacuum chamber was opened after a month of rigorous testing of ESA’s Euclid mission to explore the dark Universe. In Cannes the fully integrated spacecraft was subjected to the conditions of space and its subsystems were fully tested for the first time. With the Euclid space telescope, scientists hope to learn more about dark matter and dark energy which could make up more than 95% of our Universe.
      The film includes soundbites from ESA Euclid Mission and Payload Manager: Alexander Short and ESA Euclid VIS-Instrument Engineer: Magdalena Szafraniec.
      View the full article
    • By European Space Agency
      Video: 00:06:36 Galileo has grown to become Europe’s single largest satellite constellation, and the world’s most accurate satellite navigation system, delivering metre-level positioning to more than 3.5 billion users around the globe.
      It all began at ESTEC’s Test Centre, Europe’s largest satellite testing facility. This is where the very first positioning fix took place in March 2013, after the launch into orbit of the initial four IOV satellites. Following that, all 34 Galileo Full Operational Capability satellites also passed by ESTEC for their pre-flight testing.
      This 3000 sq. m environmentally-controlled complex, operated and managed by European Test Services for ESA, hosts an array of test equipment able to simulate all aspects of spaceflight, from the noise and vibration of launch to the vacuum and temperature extremes of Earth orbit.
      The production line at manufacturer OHB in Germany completed one new satellite every six weeks. After integration each satellite was then shipped to the ESTEC Test Centre for a three-month test campaign, after which it would be accepted by the Agency and declared ready for flight. Some facilities have had to be adapted specifically for Galileo, and the ESTEC Test Centre had to institute new security protocols because this was the first time that satellites with security restrictions were being tested at the site.
      Today there are 28 of these Galileo First Generation satellites in service, with 10 more due to be launched in the next years. Upgraded Galileo Second Generation satellites are under development and will follow them into orbit later this decade.
      Members of ESA’s Galileo team and ETS look back on this massive testing effort that established Galileo was ready for space.
      About Galileo
      Galileo is managed and funded by the European Union. The European Commission, ESA and EUSPA (the EU Agency for the Space Programme) have signed an agreement by which ESA acts as design authority and system development prime on behalf of the Commission and EUSPA as the exploitation and operation manager of Galileo/EGNOS.
      View the full article
    • By NASA
      The Results of Our DART Planetary Defense Test on This Week @NASA – October 14, 2022
    • By NASA
      NASA will host a media briefing at 2 p.m. EDT, Tuesday, Oct. 11, to discuss the agency’s Double Asteroid Redirection Test (DART) mission and its intentional collision with its target asteroid, Dimorphos.View the full article
  • Check out these Videos

×
×
  • Create New...