Jump to content

Ireland’s first satellite on its way to launch


Recommended Posts

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By Space Force
      Col. Nick Hague and his crewmates from the NASA SpaceX Crew-9 mission met with Airmen and Guardians to speak with and give thanks to representatives of military units who make manned spaceflight missions possible.

      View the full article
    • By NASA
      On July 23, 1999, space shuttle Columbia took to the skies on its 26th trip into space, to deliver its heaviest payload ever – the Chandra X-ray Observatory. The STS-93 crew included Commander Eileen M. Collins, the first woman to command a space shuttle mission, Pilot Jeffrey S. Ashby, and Mission Specialists Catherine “Cady” G. Coleman, Steven A. Hawley, and Michel A. Tognini of the French Space Agency (CNES). On the mission’s first day, they deployed Chandra, the most powerful X-ray telescope. With a planned five-year lifetime, Chandra continues its observations after a quarter century. For the next four days, the astronauts worked on twenty secondary middeck payloads and conducted Earth observations. The successful five-day mission ended with a night landing.

      Left: The STS-93 crew patch. Middle: Official photo of the STS-93 crew of Eileen M. Collins, left, Steven A. Hawley, Jeffrey S. Ashby, Michel A. Tognini of France, and Catherine “Cady” G. Coleman. Right: The patch for the Chandra X-ray Observatory.
      Tognini, selected by CNES in 1985 and a member of NASA’s class of 1995, received the first assignment to STS-93 in November 1997. He previously flew aboard Mir as a cosmonaut researcher, spending 14 days aboard the station in 1992. On March 5, 1998, First Lady Hilary R. Clinton announced Collins’ assignment as the first woman space shuttle commander in a ceremony at the White House together with President William J. “Bill” Clinton. NASA announced the rest of the crew the same day. For Collins, selected in the class of 1990, STS-93 represented her third space mission, having previously served as pilot on STS-63 and STS-84. Ashby, a member of the class of 1994, made his first flight aboard STS-93, while Coleman, selected in 1992, made her second flight, having flown before on STS-73. Hawley made his fifth flight, having previously served as a mission specialist on STS-41D, STS-61C, STS-31, and STS-82. He has the distinction of making the last flight by any member of his class of 1978, more than 21 years after his selection.

      Left: Schematic of the Chandra X-ray Observatory showing its major components. Right: Diagram of the trajectory Chandra took to achieve its final operational 64-hour orbit around the Earth – IUS refers to the two burns of the Inertial Upper Stage and IPS to the five burns of Chandra’s Integral Propulsion System.
      Because the Earth’s atmosphere absorbs X-ray radiation emitted by cosmic sources, scientists first came up with the idea of a space-based X-ray telescope in the 1970s. NASA launched its first X-ray telescope called Einstein in 1978, but scientists needed a more powerful instrument, and they proposed the Advanced X-ray Astrophysics Facility (AXAF). After a major redesign of the telescope in 1992, in 1998 NASA renamed AXAF the Chandra X-ray Observatory after Indian American Nobel Prize-winning theoretical physicist Subrahmanyan Chandrasekhar who made significant contributions to our knowledge about stars, stellar evolution, and black holes. Chandra, the third of NASA’s four Great Observatories, can detect X-ray sources 100 times fainter than any previous X-ray telescope. At 50,162 pounds including the Inertial Upper Stage (IUS) it used to achieve its operational orbit, Chandra remains the heaviest payload ever launched by the space shuttle, and at 57 feet long, it took up nearly the entire length of the payload bay. It has far exceeded its expected five-year lifetime, still returning valuable science after 25 years.

      Left: The STS-93 crew during the Terminal Countdown Demonstration Test. Middle: The Chandra X-ray Observatory loaded into Columbia’s payload bay. Right: Liftoff of Columbia on the STS-93 mission carrying the Chandra X-ray Observatory and the first woman shuttle commander.
      Columbia returned to KSC following its previous flight, the STS-90 Neurolab mission, in May 1998. Workers in KSC’s Orbiter Processing Facility (OPF) serviced the orbiter and removed the previous payload. With all four orbiters at KSC at the same time, workers temporarily stowed Columbia in the Vehicle Assembly Building (VAB), returning it to the OPF for final preflight processing on April 15, 1999. Rollover of Columbia from the OPF to the VAB took place on June 2, where workers mated it with an external tank and two solid rocket boosters. Following integrated testing, the stack rolled out to Launch Pad 39B on June 7. The crew participated in the Terminal Countdown Demonstration Test on June 24. Workers placed Chandra in Columbia’s payload bay three days later.
      On July 23, 1994, Columbia thundered into the night sky from KSC’s Launch Pad 39B to begin the STS-93 mission. Two previous launch attempts on July 20 and 22 resulted in scrubs due to a faulty sensor and bad weather, respectively. As Columbia rose into the sky, for the first time in shuttle history a woman sat in the commander’s seat. Far below, problems arose that could have led to a catastrophic abort scenario. During the engine ignition sequence, a gold pin in Columbia’s right engine came loose, ejected with great force by the rapid flow of hot gases, and struck the engine’s nozzle, punching holes in three of its hydrogen cooling tubes. Although small, the hydrogen leak caused the engine’s controller to increase the flow of oxidizer, making the engine run hotter than normal. Meanwhile, a short-circuit knocked out the center engine’s digital control unit (DCU) and the right engine’s backup DCU. Both engines continued powered flight without a redundant DCU, with a failure in either causing a catastrophic abort. Although this did not occur, the higher than expected oxidizer usage led to main engine cutoff occurring 1.5 seconds early, leaving Columbia in a lower than planned orbit. The shuttle’s Orbiter Maneuvering System engines made up for the deficit. The harrowing events of the powered flight prompted Ascent Flight Director John P. Shannon to comment, “Yikes! We don’t need any more of these.”

      Left: Eileen M. Collins, the first woman shuttle commander, shortly after reaching orbit. Right: First time space flyer STS-93 Pilot Jeffrey S. Ashby, shortly after reaching space.
      After reaching orbit, the crew opened the payload bay doors and deployed the shuttle’s radiators, and removed their bulky launch and entry suits, stowing them for the remainder of the flight. The astronauts prepared for the mission’s primary objective, deployment of Chandra, and also began activating some of the middeck experiments.

      Left: The Chandra X-ray Observatory in Columbia’s payload bay shortly after reaching orbit. Middle: Chandra raised to the deployment angle. Right: Chandra departs Columbia.
      Coleman had prime responsibility for deploying Chandra. After initial checkout of the telescope by ground teams, the astronauts tilted Chandra and the IUS to an angle of 29 degrees. After additional checks, they tilted it up to the release angle of 58 degrees. A little over seven hours after launch, Coleman deployed the Chandra/IUS stack. Collins and Ashby flew Columbia to a safe distance, and about an hour after deployment, the IUS fired its first stage engine for about two minutes, followed by a two-minute burn of the second stage. This placed Chandra in a temporary elliptical Earth orbit with a high point of 37,200 miles. After separation of the IUS, Chandra used its own propulsion system over the next 10 days to raise its altitude to 6,214 miles by 86,992 miles, its operational orbit, circling the Earth every 64 hours. For the next four days of the mission, the astronauts operated about 20 middeck experiments, including a technology demonstration of a treadmill vibration isolation system planned for the International Space Station.

      Left: Michel A. Tognini works with the Commercial Generic Bioprocessing Apparatus. Middle: Jeffrey S. Ashby checks the status of the Space Tissue Lab experiment. Right: Catherine G. Coleman harvests plants from the Plant Growth in Microgravity experiment.

      Left: Catherine G. Coleman, left, and Michel A. Tognini pose near the Lightweight Flexible Solar Array Hinge technology demonstration experiment. Middle: Stephen A. Hawley checks the status of the Micro Electromechanical Systems experiment. Right: Tognini places samples of the Biological Research in Canisters experiment into a gaseous nitrogen freezer.

      Left: Eileen M. Collins runs on the Treadmill Vibration Isolation System. Middle: Stephen A. Hawley, left, and Michel A. Tognini operate the Southwest Ultraviolet Imaging System instrument. Right: Inflight photograph of the STS-93 crew.

      A selection of the STS-93 crew Earth observation photographs. Left: Laguna Verde in Chile. Middle left: Sunrise over the Mozambique Channel. Middle right: Darling River and lakes in Australia. Right: The Society Islands of Bora Bora, Tahaa, and Raiatea.

      Left: Eileen M. Collins prepares to bring Columbia home. Middle: Columbia streaks through the skies over NASA’s Johnson Space Center in Houston during reentry. Right: Collins guides Columbia to a smooth touchdown on the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida.

      Left: Three holes visible in the hydrogen cooling tubes of Columbia’s right main engine, seen after landing. Middle: The STS-93 crew pose in front of Columbia on the Shuttle Landing Facility at NASA’s Kennedy Space Center in Florida. Right: Eileen M. Collins addresses the crowd at Houston’s Ellington Field during the welcome home ceremony for the STS-93 crew, as Vice President Albert “Al” A. Gore and other dignitaries listen.
      At the end of five days, the astronauts finished the last of the experiments and prepared for the return to Earth. On July 28, they closed Columbia’s payload bay doors, donned their launch and entry suits, and strapped themselves into their seats for entry and landing. Collins piloted Columbia to a smooth landing on KSC’s Shuttle Landing Facility, completing the 12th night landing of the shuttle program. The crew had flown 80 orbits around the Earth in 4 days, 22 hours, and 50 minutes. Columbia wouldn’t fly again until March 2002, the STS-109 Hubble Servicing Mission-3B. A postflight investigation into the cause of the short on ascent that led to two DCUs failing revealed a wire with frayed insulation, likely caused by workers inadvertently stepping on it, that rubbed against a burred screw head that had likely been there since Columbia’s manufacture. The incident resulted in significant changes to ground processes during shuttle inspections and repairs. With regard to the pin ejected during engine ignition that damaged the hydrogen cooling tubes, investigators found that those pins never passed any acceptance testing. Since STS-93 marked the last flight of that generation of main engines, newer engines incorporated a different configuration, requiring no design or other changes.
      Enjoy the crew narrate a video about the STS-93 mission. Read Hawley’s recollections of the STS-93 mission in his oral history with the JSC History Office.
      Explore More
      11 min read 45 Years Ago: Space Shuttle Enterprise Completes Launch Pad Checkout
      Article 9 hours ago 5 min read Eileen Collins Broke Barriers as America’s First Female Space Shuttle Commander
      Article 2 days ago 8 min read 55 Years Ago: Apollo 11’s One Small Step, One Giant Leap
      Article 1 week ago
      View the full article
    • By NASA
      3 min read
      Preparations for Next Moonwalk Simulations Underway (and Underwater)
      A graphic representation of a laser communications relay between the International Space Station, the Laser Communications Relay Demonstration spacecraft, and the Earth.Credit: NASA/Dave Ryan A team at NASA’s Glenn Research Center in Cleveland streamed 4K video footage from an aircraft to the International Space Station and back for the first time using optical, or laser, communications. The feat was part of a series of tests on new technology that could provide live video coverage of astronauts on the Moon during the Artemis missions.

      Historically, NASA has relied on radio waves to send information to and from space. Laser communications use infrared light to transmit 10 to 100 times more data faster than radio frequency systems.

      From left to right, Kurt Blankenship, research aircraft pilot, Adam Wroblewski, instrument operator, and Shaun McKeehan, High-Rate Delay Tolerant Networking software developer, wait outside the PC-12 aircraft, preparing to take flight. Credit: NASA/Sara Lowthian-Hanna Working with the Air Force Research Laboratory and NASA’s Small Business Innovation Research program, Glenn engineers temporarily installed a portable laser terminal on the belly of a Pilatus PC-12 aircraft. They then flew over Lake Erie sending data from the aircraft to an optical ground station in Cleveland. From there, it was sent over an Earth-based network to NASA’s White Sands Test Facility in Las Cruces, New Mexico, where scientists used infrared light signals to send the data.

      The signals traveled 22,000 miles away from Earth to NASA’s Laser Communications Relay Demonstration (LCRD), an orbiting experimental platform. The LCRD then relayed the signals to the ILLUMA-T (Integrated LCRD LEO User Modem and Amplifier Terminal) payload mounted on the orbiting laboratory, which then sent data back to Earth. During the experiments, High-Rate Delay Tolerant Networking (HDTN), a new system developed at Glenn, helped the signal penetrate cloud coverage more effectively.

      To view this video please enable JavaScript, and consider upgrading to a web browser that supports HTML5 video
      4K video footage was routed from the PC-12 aircraft to an optical ground station in Cleveland. From there, it was sent over an Earth-based network to NASA’s White Sands Test Facility in Las Cruces, New Mexico. The signals were then sent to NASA’s Laser Communications Relay Demonstration spacecraft and relayed to the ILLUMA-T payload on the International Space Station. Video Credit: NASA/Morgan Johnson “These experiments are a tremendous accomplishment,” said Dr. Daniel Raible, principal investigator for the HDTN project at Glenn. “We can now build upon the success of streaming 4K HD videos to and from the space station to provide future capabilities, like HD videoconferencing, for our Artemis astronauts, which will be important for crew health and activity coordination.”

      Mechanical Engineer Jeff Pollack finalizes his design for the integration of the laser communications terminal into the PC-12 research aircraft.Credit: NASA/Sara Lowthian-Hanna After each flight test, the team continuously improved the functionality of their technology. Aeronautics testing of space technology often finds issues more effectively than ground testing, while remaining more cost-effective than space testing. Proving success in a simulated space environment is key to moving new technology from a laboratory into the production phase.

      “Teams at Glenn ensure new ideas are not stuck in a lab, but actually flown in the relevant environment to ensure this technology can be matured to improve the lives of all of us,” said James Demers, chief of aircraft operations at Glenn.

      The flights were part of an agency initiative to stream high-bandwidth video and other data from deep space, enabling future human missions beyond low Earth orbit. As NASA continues to develop advanced science instruments to capture high-definition data on the Moon and beyond, the agency’s Space Communications and Navigation, or SCaN, program embraces laser communications to send large amounts of information back to Earth.
      The optical system temporarily installed on the belly of the PC-12 aircraft has proven to be a very reliable high-performance system to communicate with prototype flight instrumentation and evaluate emerging technologies to enhance high-bandwidth systems.Credit: NASA/Sara Lowthian-Hanna While the ILLUMA-T payload is no longer installed on the space station, researchers will continue to test 4K video streaming capabilities from the PC-12 aircraft through the remainder of July, with the goal of developing the technologies needed to stream humanity’s return to the lunar surface through Artemis.
      Explore More
      10 min read LIVE: NASA is with you from Oshkosh
      Article 1 hour ago 5 min read NASA’s 21st Northrop Grumman Mission Launches Scientific Studies to Station
      Article 1 day ago 5 min read Ground Antenna Trio to Give NASA’s Artemis Campaign ‘LEGS’ to Stand On
      Article 2 days ago View the full article
    • By NASA
      On July 23, 1979, space shuttle Enterprise completed its time as a pathfinder vehicle at Launch Pad 39A at NASA’s Kennedy Space Center (KSC) in Florida. Workers towed it back to the Vehicle Assembly Building (VAB). During its four-month stay at KSC, Enterprise validated procedures for the assembly of the space shuttle stack and interfaces at the launch pad. The tests proved valuable in preparing space  shuttle Columbia for its first orbital mission in 1981. Earlier, Enterprise proved the flight worthiness of the shuttle during atmospheric tests and certified the vehicle’s structure to handle launch loads. Later, Enterprise supported the Challenger and Columbia accident investigations. Following a restoration, Enterprise went on public display, first near Washington, D.C., and then in New York City where it currently resides.

      Left: NASA Administrator James C. Fletcher, left, poses with several cast members and creator of the TV series “Star Trek” at Enterprise’s rollout. Middle: Enterprise moments after release from the back of the Shuttle Carrier Aircraft during the first Approach and Landing Test free flight. Right: At NASA’s Marshall Space Flight Center in Huntsville, Alabama, for vibration tests, a shuttle orbiter joins an External Tank and twin Solid Rocket Boosters for the first time.
      On Jan. 5, 1972, President Richard M. Nixon directed NASA to build the reusable space shuttle, formally called the Space Transportation System (STS). Manufacture of the first components of Orbital Vehicle-101 (OV-101) at the North American Rockwell Corporation’s plant in Downey, California, began on June 4, 1974. This first vehicle, designed for ground and atmospheric flight tests, received the name Enterprise, following a dedicated write-in campaign by fans of the television science fiction series “Star Trek.” Enterprise rolled out of Rockwell’s Palmdale facility on Sept. 17, 1976. In January 1977, workers trucked Enterprise 36 miles overland from Palmdale to NASA’s Dryden, now Armstrong, Flight Research Center at Edwards Air Force Base (AFB) in California, for the Approach and Landing Tests (ALT), a series of increasingly complex flights to evaluate the shuttle’s air worthiness. At Dryden, workers placed Enterprise on the back of the Shuttle Carrier Aircraft (SCA), a modified Boeing 747. The duo began taxi runs in February, followed by the first captive inactive flight later that month. The first captive active flight with a crew aboard the orbiter took place in June, and Enterprise made its first independent flight on Aug. 12. Four additional approach and landing flights completed the ALT program by October. In March 1978, Enterprise began its first cross-country trip from Edwards to the Redstone Arsenal’s airfield in Huntsville, Alabama. Workers trucked Enterprise to the adjacent NASA Marshall Space Flight Center where engineers for the first time mated it with an External Tank (ET) and inert Solid Rocket Boosters (SRB) in the Dynamic Structural Test Facility. For the next year, engineers conducted a series of vibration tests on the combined vehicle, simulating conditions expected during an actual launch.

      Left: Enterprise atop its Shuttle Carrier Aircraft (SCA) touches down on the runway at NASA’s Kennedy Space Center in Florida. Middle: Workers remove Enterprise from the SCA in the Mate-Demate Device. Right: Workers tow Enterprise into the Vehicle Assembly Building.

      Left: At NASA’s Kennedy Space Center in Florida, workers in the Vehicle Assembly Building prepare to lift Enterprise. Middle: Enterprise in the vertical position. Right: Workers lower Enterprise for attachment to the External Tank and Solid Rocket Boosters.
      Following the year-long series of tests at Marshall, on April 10, 1979, NASA ferried Enterprise atop its SCA to KSC. Workers at the SLF removed the orbiter from the back of the SCA in the Mate-Demate Device,and towed it into High Bay 3 of the VAB where on April 25 they completed attaching it to an ET and inert SRBs on a Mobile Launch Platform (MLP) repurposed from carrying Saturn rockets. These activities enabled verification of towing, assembly, and checkout procedures. Since the Apollo and Skylab programs, engineers had made many significant modifications to Launch Pads 39A and 39B to accommodate the space shuttle. Among these included the addition of a fixed launch tower, accommodations for payload handling, and a mobile service structure for access to the vehicle.

      Left: Enterprise exiting the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. Middle: Enterprise on its Mobile Launch Platform during the rollout to the pad. Right: Enterprise at Launch Pad 39A.
      Rollout of Enterprise from the VAB to Launch Pad 39A occurred on May 1, and its arrival marked the first time that a vehicle stood on that facility since the Skylab 1 space station launch in May 1973. The assembled vehicle including the MLP weighed about 11 million pounds. Technicians drove the stack atop the Crawler Transporter at varying speeds to determine the optimum velocity to minimize vibration stress on the vehicle. The 3.5-mile rollout took about eight hours to complete. Once at the pad, engineers used Enterprise to conduct fit checks and to validate launch pad procedures. During the critical countdown demonstration test, workers filled the ET with super-cold liquid hydrogen and liquid oxygen. The significant discovery that ice built up at the top of the ET during this process led to the addition of the gaseous oxygen vent hood (familiarly known as the “beanie cap”) to the launch pad facility and a procedure to retract it just a few minutes before liftoff. This prevented the dangerous buildup of ice during the countdown and ranks as perhaps one of Enterprise’s greatest contributions as a test vehicle during its time at the launch pad.

      Left: Engineer Richard W. Nygren poses in front of Enterprise at Launch Pad 39A with astronauts Richard H. Truly, John W. Young, Robert L. Crippen, and Joe H. Engle, the prime and backup crews assigned to STS-1, the first space shuttle mission. Middle left: Pilot’s eye view of the launch tower looking up through Enterprise’s forward windows. Middle right: Enterprise rolls back into the Vehicle Assembly Building. Right: Enterprise departs NASA’s Kennedy Space Center in Florida atop the Shuttle Carrier Aircraft.
      On July 23, after three months of fit checks and testing, workers rolled Enterprise back from Launch Pad 39A to the VAB’s High Bay 1. The activities conducted at the pad proved instrumental in paving the way for its sister ship Columbia to make its first launch in 1981. John Bell, who managed the activities at KSC said of the test program, “Overall, it was a very successful venture and well worth it.” Launch Pad 39A Site Manager John J. “Tip” Talone added, “Having [Enterprise] out here really saved the program a lot of time in getting things ready for [Columbia].” In the VAB, workers removed Enterprise from its ET on July 25 and towed it to the SLF on Aug. 3 where it awaited the arrival of the SCA. The ferry flight back to Dryden took place Aug. 10-16, making six stops along the way – Atlanta, St. Louis, Tulsa, Denver, Salt Lake City, and Vandenberg AFB in California. Up to 750,000 people came out to see the orbiter and SCA. Back at Dryden, workers demated Enterprise and on Oct. 30 trucked it back to the Palmdale plant where engineers removed computers and instruments to be refurbished and used in other orbiters then under construction. Previous plans to convert Enterprise into an orbital vehicle proved too costly and NASA abandoned the idea.

      Left: Enterprise as the backdrop for President Ronald W. Reagan welcomes home the STS-4 crew at NASA’s Dryden, now Armstrong, Flight Research Center in July 1982. Middle: Enterprise on display at the World’s Fair in New Orleans in 1984. Right: Enterprise during static pad tests at Space Launch Complex-6 at Vandenberg Air Force, now Space Force, Base in 1985.
      With its major pathfinder tasks completed, and its future uncertain, NASA returned Enterprise to Dryden on Sep. 6, 1981, for long-term storage. On July 4, 1982, NASA used it as a backdrop for President Ronald W. Reagan to welcome home the STS-4 crew. The following year, NASA sent Enterprise on a European tour, departing Dryden on May 13, 1983, with stops in the United Kingdom, Germany, Italy, and France for the annual Paris Air Show. Enterprise made a stop in Ottawa, Canada, on its return trip to Dryden, arriving there June 13. Workers once again placed it in temporary storage. For its next public appearance, NASA placed it on display in the U.S. pavilion of the World’s Fair in New Orleans between April and November 1984. After the World’s Fair, NASA ferried Enterprise to Vandenberg AFB in California to conduct fit checks at the Space Launch Complex-6 (SLC-6), that NASA had planned to use for polar orbiting shuttle missions. NASA used Enterprise to conduct tests at SLC-6 similar to the 1979 tests at KSC’s Launch Complex 39. The tests at Vandenberg completed, NASA ferried Enterprise back to Dryden on May 24, 1985, but this time for only a short-term storage. On Sep. 20, 1985, NASA ferried Enterprise to KSC and placed it on temporary public display near the VAB, next to the Saturn V already displayed there. After two months on display at KSC, NASA flew Enterprise to Dulles International Airport in Chantilly, Virginia, arriving on Nov. 18. NASA officially retired Enterprise and transferred ownership to the Smithsonian Institution that had plans to build a large aircraft museum annex at the airport. The Smithsonian placed Enterprise in storage in a hangar, awaiting the completion of its new home. That turned into an 18-year wait.

      Left: Launch of STS-61A in October 1985, with Enterprise and the Saturn V in the foreground. Middle: Enterprise in long-term storage at Dulles International Airport in Chantilly, Virginia. Right: Enterprise during arresting barrier testing at Dulles.
      But even during that 18-year wait, NASA found practical use for the venerable Enterprise. In 1987, the agency studied how to handle an orbiter returning from space should it suffer a brake failure. To test the efficacy of an arresting barrier, workers at Dulles slowly winched Enterprise into a landing barrier to see if the vehicle suffered any damage. Later that same year, NASA used Enterprise to test various crew bailout procedures being developed in the wake of the Challenger accident. In 1990, experimenters used Enterprise’s cockpit windows to test mount an antenna for the Shuttle Amateur Radio Experiment, with no other orbiters available. Periodically, engineers removed parts from Enterprise to test for materials durability, and evaluated the structural integrity of the vehicle including its payload bay doors and found it to be in sound condition even after years in storage. In April 2003, in the wake of the Columbia accident, investigators borrowed Enterprise’s left landing gear door and part of the port wing for foam impact tests. The tests provided solid evidence for the foam strike as the cause of the accident.

      Left: Space shuttle Enterprise undergoes restoration at the Stephen F. Udvar-Hazy Center of the Smithsonian Institution’s National Air and Space Museum (NASM) in Chantilly, Virginia. Note the missing wing leading edge, donated for the Columbia accident investigation. Right: Enterprise on display at the Hazy Center. Image credits: courtesy NASM.
      On Nov. 20, 2003, workers towed Enterprise from its storage facility into a newly completed display hangar at the Stephen F. Udvar-Hazy Center of the Smithsonian Institution’s National Air and Space Museum at Dulles. After specialists spent eight months restoring the orbiter, the museum placed it on public display on Dec. 15, 2004.

      Left: Space shuttle orbiters Enterprise, left, and Discovery meet nose-to-nose at the Stephen F. Udvar-Hazy Center of the Smithsonian Institution’s National Air and Space Museum in Chantilly, Virginia. Right: Actor Leonard Nimoy greets Enterprise at New York’s John F. Kennedy International Airport.
      In 2011, NASA retired the space shuttle fleet and donated the vehicles to various museums around the country. The Intrepid Sea, Air & Space Museum in New York City acquired Enterprise, and on Apr. 19, 2012, workers removed the orbiter from its display at the Hazy Center – replacing it with the orbiter Discovery – and placed it atop a SCA for the final time. Eight days later, after a short flight from Dulles, Enterprise landed at John F. Kennedy International Airport. Workers lifted the orbiter from the SCA and placed it on a barge. It eventually arrived at the Intrepid Museum on June 3 and went on public display July 19. Enterprise suffered minor damage during Superstorm Sandy in October 2012, but workers fully restored it.

      Enterprise in the Shuttle Pavilion at the Intrepid Sea, Air & Space Museum in New York City. Image credit: courtesy Intrepid Museum.
      Explore More
      5 min read Eileen Collins Broke Barriers as America’s First Female Space Shuttle Commander
      Article 2 days ago 8 min read 55 Years Ago: Apollo 11’s One Small Step, One Giant Leap
      Article 1 week ago 13 min read 15 Years Ago: STS-127 Delivers Japanese External Platform to Space Station
      Article 1 week ago View the full article
    • By NASA
      3 min read
      Preparations for Next Moonwalk Simulations Underway (and Underwater)
      NASA astronaut Kate Rubins uses a hammer to get a drive tube into the ground to collect a pristine soil sample during a nighttime simulated moonwalk in the San Francisco Volcanic Field in Northern Arizona on May 16, 2024. Surviving and operating through the lunar night was identified as a top-ranked 2024 Civil Space Challenge, and tests such as these help NASA astronauts and engineers practice end-to-end lunar operations. NASA/Josh Valcarcel This spring, NASA published a document overviewing almost 200 technology areas requiring further development to meet future exploration, science, and other mission needs – and asked the aerospace community to rate their importance. The goal was to better integrate the community’s most pervasive technical challenges, or shortfalls, to help guide NASA’s space technology development and investments.
      Today, NASA’s Space Technology Mission Directorate (STMD) released the 2024 Civil Space Shortfall Ranking document, integrating inputs from NASA mission directorates and centers, small and large industry organizations, government agencies, academia, and other interested individuals. STMD will use the inaugural list and annual updates as one of many factors to guide its technology development projects and investments.
      “Identifying consensus among challenges across the aerospace industry will help us find solutions, together,” said NASA Associate Administrator Jim Free. “This is the groundwork for strengthening the nation’s technological capabilities to pave the way for new discoveries, economic opportunities, and scientific breakthroughs that benefit humanity.”
      The integrated results show strong stakeholder agreement among the 30 most important shortfalls. At the top of the list is surviving and operating through the lunar night, when significant and sustained temperature drops make it difficult to run science experiments, rovers, habitats, and more. Solution technologies could include new power, thermal management, and motor systems. Second and third on the integrated list are the need for high-power energy generation on the Moon and Mars and high-performance spaceflight computing.
      The inputs received are already igniting meaningful conversations to help us and our stakeholders make smarter decisions. We will refine the process and results annually to ensure we maintain a useful approach and tool that fosters resilience in our space technology endeavors.”
      Michelle Munk
      Acting Chief Architect for STMD
      Highly rated capability areas in the top 20 included advanced habitation systems, autonomous systems and robotics, communications and navigation, power, avionics, and nuclear propulsion. Beyond the top quartile, stakeholder shortfall scores varied, likely aligning with their interests and expertise. With many shortfalls being interdependent, it emphasizes the need to make strategic investments across many areas to maintain U.S. leadership in space technology and drive economic growth.
      STMD is evaluating its current technology development efforts against the integrated list to identify potential adjustments within its portfolio.
      “This effort is an excellent example of our directorates working together to assess future architecture needs that will enable exploration and science for decades to come,” said Nujoud Merancy, deputy associate administrator for the Strategy and Architecture Office within NASA’s Exploration Systems Development Mission Directorate.
      The 2024 results are based on 1,231 total responses, including 769 internal and 462 external responses. Twenty were consolidated responses, representing multiple individuals from the same organization. Once average shortfall scores were calculated for each organization, STMD grouped, totaled, and averaged scores for nine stakeholder groups and then applied pre-determined weights to each to create the overall ranking. In the document, NASA also published the ranked results for each stakeholder group based on the 2024 feedback.
      The rankings are based on the numerical scores received and not responses to the open-ended questions. NASA anticipates the qualitative feedback will uncover additional insights and more.
      NASA will host a webinar to overview the ranking process and results on July 26, 2024, at 2 p.m. EDT.
      Register for the Stakeholder Webinar “Communicating our most pressing technology challenges is a great way to tap into the abilities across all communities to provide solutions to critical problems,” said Dr. Carolyn Mercer, chief technologist for NASA’s Science Mission Directorate.
      To learn more about the inaugural civil space shortfall feedback opportunity and results as well as monitor future feedback opportunities, visit:
      www.nasa.gov/civilspaceshortfalls

      View the full article
  • Check out these Videos

×
×
  • Create New...