Jump to content

Recommended Posts

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      One half of NASA’s nearly complete Nancy Grace Roman Space Telescope just passed a lengthy test to ensure it will function properly in the space environment. This milestone keeps Roman well on track for its target launch by May 2027, with the team aiming for as early as fall 2026.
      This photo shows half of the NASA’s Nancy Grace Roman observatory — the outer barrel assembly, deployable aperture cover, and test solar arrays — fully deployed in a thermal chamber at NASA’s Goddard Space Flight Center in Greenbelt, Md., for environmental testing. Credit: NASA/Sydney Rohde “This milestone tees us up to attach the flight solar array sun shield to the outer barrel assembly, and deployable aperture cover, which we’ll begin this month,” said Jack Marshall, who leads integration and testing for these elements at NASA’s Goddard Space Flight Center in Greenbelt, Maryland. “Then we’ll complete remaining environmental tests for the flight assembly before moving on to connect Roman’s two major assemblies and run the full observatory through testing, and then we’ll be ready to launch!”
      Prior to this thermal testing, technicians integrated Roman’s deployable aperture cover, a visor-like sunshade, to the outer barrel assembly, which will house the telescope and instruments, in January, then added test solar panels in March. They moved this whole structure into the Space Environment Simulator test chamber at NASA Goddard in April.
      There, it was subjected to the hot and cold temperatures it will experience in space. Next, technicians will join Roman’s flight solar panels to the outer barrel assembly and sunshade. Then the structure will undergo a suite of assessments, including a shake test to ensure it can withstand the vibrations experienced during launch.
      This photo captures the installation of the test solar panels for NASA’s Nancy Grace Roman Space Telescope, which took place in March. One panel is lifted in the center of the frame on its way to being attached to the outer barrel assembly at right. The deployable aperture cover is stowed on the front of the outer barrel assembly, and the other half of the observatory — the spacecraft and integrated payload assembly, which consists of the telescope, instrument carrier, and two instruments — appears at the left of the photo.Credit: NASA/Jolearra Tshiteya Meanwhile, Roman’s other major portion — the spacecraft and integrated payload assembly, which consists of the telescope, instrument carrier, and two instruments — will undergo its own shake test, along with additional assessments. Technicians will install the lower instrument sun shade and put this half of the observatory through a thermal vacuum test in the Space Environment Simulator.
      “The test verifies the instruments will remain at stable operating temperatures even while the Sun bakes one side of the observatory and the other is exposed to freezing conditions — all in a vacuum, where heat doesn’t flow as readily as it does through air,” said Jeremy Perkins, an astrophysicist serving as Roman’s observatory integration and test scientist at NASA Goddard. Keeping the instrument temperatures stable ensures their readings will be precise and reliable.
      Technicians are on track to connect Roman’s two major parts in November, resulting in a complete observatory by the end of the year. Following final tests, Roman is expected to ship to the launch site at NASA’s Kennedy Space Center in Florida for launch preparations in summer 2026. Roman remains on schedule for launch by May 2027, with the team aiming for launch as early as fall 2026.
      This infographic shows the two major subsystems that make up NASA’s Nancy Grace Roman Space Telescope. The subsystems are each undergoing testing prior to being joined together this fall.Credit: NASA’s Goddard Space Flight Center To virtually tour an interactive version of the telescope, visit:
      https://roman.gsfc.nasa.gov/interactive
      The Nancy Grace Roman Space Telescope is managed at NASA’s Goddard Space Flight Center in Greenbelt, Maryland, with participation by NASA’s Jet Propulsion Laboratory in Southern California; Caltech/IPAC in Pasadena, California; the Space Telescope Science Institute in Baltimore; and a science team comprising scientists from various research institutions. The primary industrial partners are BAE Systems Inc. in Boulder, Colorado; L3Harris Technologies in Rochester, New York; and Teledyne Scientific & Imaging in Thousand Oaks, California.
      By Ashley Balzer
      NASA’s Goddard Space Flight Center, Greenbelt, Md.
      ​​Media Contact:
      Claire Andreoli
      NASA’s Goddard Space Flight Center
      301-286-1940
      Share
      Details
      Last Updated May 07, 2025 EditorAshley BalzerContactAshley Balzerashley.m.balzer@nasa.govLocationNASA Goddard Space Flight Center Related Terms
      Nancy Grace Roman Space Telescope Goddard Space Flight Center Technology Explore More
      6 min read NASA’s Roman Mission Shares Detailed Plans to Scour Skies
      Article 2 weeks ago 6 min read Team Preps to Study Dark Energy via Exploding Stars With NASA’s Roman
      Article 2 months ago 6 min read How NASA’s Roman Space Telescope Will Illuminate Cosmic Dawn
      Article 10 months ago View the full article
    • By NASA
      Intuitive Machines’ IM-2 captured an image March 6, 2025, after landing in a crater from the Moon’s South Pole. The lunar lander is on its side about 820 feet from the intended landing site, Mons Mouton. In the center of the image between the two lander legs is the Polar Resources Ice Mining Experiment 1 suite, which shows the drill deployed.Credit: Intuitive Machines Shortly after touching down inside a crater on the Moon, carrying NASA technology and science on its IM-2 mission, Intuitive Machines collected some data for the agency before calling an early end of mission at 12:15 a.m. CST Friday.
      As part of the company’s second Moon delivery for NASA under the agency’s CLPS (Commercial Lunar Payload Services) initiative and Artemis campaign, the IM-2 mission included a drill to bring lunar soil to the surface and a mass spectrometer to look for the presence of volatiles, or gases, that could one day help provide fuel or breathable oxygen to future Artemis explorers.
      Planned to land at Mons Mouton, IM-2 touched down at approximately 11:30 a.m. March 6, more than 1,300 feet (400 meters) from its intended landing site. Intuitive Machines said images collected later confirmed the lander was on its side, preventing it from fully operating the drill and other instruments before its batteries were depleted.
      The IM-2 mission landed closer to the lunar South Pole than any previous lander.
      “Our targeted landing site near the lunar South Pole is one of the most scientifically interesting, and geographically challenging locations, on the Moon,” said Nicky Fox, associate administrator for science at NASA Headquarters in Washington. “Each success and setback are opportunities to learn and grow, and we will use this lesson to propel our efforts to advance science, exploration, and commercial development as we get ready for human exploration of Mars.”
      The Nova-C lander, named Athena, captured and transmitted images of the landing site before activating the technology and science instruments. Among the data collected, NASA’s PRIME-1 (Polar Resources Ice Mining Experiment 1) suite, which includes the lunar drill known as TRIDENT (The Regolith and Ice Drill for Exploring New Terrain), successfully demonstrated the hardware’s full range of motion in the harsh environment of space. The Mass Spectrometer Observing Lunar Operations (MSOLO) as part of the PRIME-1 suite of instruments, detected elements likely due to the gases emitted from the lander’s propulsion system. 
      “While this mission didn’t achieve all of its objectives for NASA, the work that went into the payload development is already informing other agency and commercial efforts,” said Clayton Turner, associate administrator for space technology, NASA Headquarters. “As we continue developing new technologies to support exploration of the Moon and Mars, testing technologies in-situ is crucial to informing future missions. The CLPS initiative remains an instrumental method for achieving this.”
      Despite the lander’s configuration, Intuitive Machines, which was responsible for launch, delivery, and surface operations under its CLPS contract, was able to complete some instrument checkouts and collect 250 megabytes of data for NASA.
      “Empowering American companies to deliver science and tech to the Moon on behalf of NASA both produces scientific results and continues development of a lunar economy,” said Joel Kearns, deputy associate administrator for Exploration in the Science Mission Directorate at NASA Headquarters. “While we’re disappointed in the outcome of the IM-2 mission, we remain committed to supporting our commercial vendors as they navigate the very difficult task of landing and operating on the Moon.”
      NASA’s Laser Retroreflector Array, a passive instrument meant to provide a reference point on the lunar surface and does not power on, will remain affixed to the top deck of the lander. Although Intuitive Machines’ Nova-C Hopper and Nokia’s 4G/LTE Tipping Point technologies, funded in part by NASA, were only able to complete some objectives, they provided insight into maturing technologies ready for infusion into a commercial space application including some checkouts in flight and on the surface.
      Intuitive Machines’ IM-2 mission launched at 6:16 p.m., Feb. 26, aboard a SpaceX Falcon 9 rocket from Launch Complex 39A at the agency’s Kennedy Space Center in Florida.
      Intuitive Machines has two more deliveries on the books for NASA in the future, with its IM-3 mission slated for 2026, and IM-4 mission in 2027.
      To date, five vendors have been awarded a total of 11 lunar deliveries under CLPS and are sending more than 50 instruments to various locations on the Moon, including the Moon’s far side and South Pole region. CLPS contracts are indefinite-delivery/indefinite-quantity contracts with a cumulative maximum contract value of $2.6 billion through 2028.
      Learn more about NASA’s CLPS initiative at:
      https://www.nasa.gov/clps
      -end-
      Cheryl Warner / Jasmine Hopkins
      Headquarters, Washington
      202-358-1600
      cheryl.m.warner@nasa.gov / jasmine.s.hopkins@nasa.gov
      Natalia Riusech / Nilufar Ramji
      Johnson Space Center, Houston
      281-483-5111
      nataila.s.riusech@nasa.gov / nilufar.ramji@nasa.gov
      Share
      Details
      Last Updated Mar 07, 2025 LocationNASA Headquarters Related Terms
      Commercial Lunar Payload Services (CLPS) Artemis Earth's Moon Science & Research Science Mission Directorate Space Technology Mission Directorate View the full article
    • By USH
      CCOR-1, a newly activated coronagraph onboard NOAA’s GOES-19 weather satellite, is the first of its kind in geostationary orbit. Positioned deep inside the Moon’s orbit, it offers a perspective unavailable to previous coronagraphs like those on SOHO. 

      New Moons are typically dark and invisible, but NOAA's CCOR-1 coronagraph just captured one in stunning detail. 
      In the footage, the Moon appears full, an illusion caused entirely by sunlight reflecting off Earth. The brightness isn’t constant, though. As sunrise progresses over the Western Hemisphere, the increasing Earthshine becomes so intense that some frames are saturated with light. 

      Credit image/source: https://spaceweather.com/

      View the full article
    • By NASA
      The Crew Health and Performance Exploration Analog (CHAPEA) team hosts a Media Day at NASA’s Johnson Space Center in Houston on April 11, 2023.Credit: NASA Media are invited to visit NASA’s simulated Mars habitat on Monday, March 10, at the agency’s Johnson Space Center in Houston. The simulation will help prepare humanity for future missions to the Red Planet.
      This is the second of three missions as part of NASA’s CHAPEA (Crew Health and Performance Exploration Analog), set to begin in May 2025 when volunteer crew members enter the 3D printed habitat to live and work for a year.
      During the mission, crew members will carry out different types of mission activities, including simulated “marswalks,” robotic operations, habitat maintenance, personal hygiene, exercise, and crop growth. Crew also will face planned environmental stressors such as resource limitations, isolation, and equipment failure.
      The in-person media event includes an opportunity to speak with subject matter experts and capture b-roll and photos inside the habitat. Crew members will arrive for training at a later date and will not be available at this event.
      To attend the event, U.S. media must request accreditation by 5 p.m. CDT Monday, March 3, and international media by 5 p.m., Monday, Feb. 24, via the NASA Johnson newsroom at: 281-483-5111 or jsccommu@nasa.gov. Media accreditation will be limited due to limited space inside the habitat. Confirmed media will receive additional details on how to participate.
      For more information about CHAPEA, visit:
      https://www.nasa.gov/humans-in-space/chapea
      -end-
      Cindy Anderson / James Gannon
      Headquarters, Washington
      202-358-1600
      cindy.anderson@nasa.gov / james.h.gannon@nasa.gov
      Kelsey Spivey
      Johnson Space Center, Houston
      281-483-5111
      kelsey.m.spivey@nasa.gov
      Victoria Segovia
      Johnson Space Center, Houston
      281-483-5111
      victoria.segovia@nasa.gov
      Share
      Details
      Last Updated Feb 20, 2025 LocationNASA Headquarters Related Terms
      Humans in Space Analog Field Testing Crew Health and Performance Exploration Analog (CHAPEA) Johnson Space Center View the full article
    • By NASA
      Crews conduct a solar array deployment test on the spacecraft of NASA’s PUNCH (Polarimeter to Unify the Corona and Heliosphere) satellites at Astrotech Space Operations located inside Vandenberg Space Force Base in California on Tuesday, Jan. 21, 2025.USSF 30th Space Wing/Antonio Ramos Technicians supporting NASA’s PUNCH (Polarimeter to Unify the Corona and Heliosphere) mission deployed and tested the spacecraft’s solar arrays at the Astrotech Space Operations processing facility at Vandenberg Space Force Base in California ahead of its launch next month.
      The arrays, essential for powering instruments and systems, mark another milestone in preparing PUNCH for its mission to study the Sun’s outer atmosphere as it transitions into the solar wind. Technicians performed the tests in a specialized cleanroom environment to prevent contamination and protect the sensitive equipment.
      Comprised of four suitcase-sized satellites working together as a constellation, PUNCH will capture continuous 3D images of the Sun’s corona and the solar wind’s journey into the solar system. Led by the Southwest Research Institute (SwRI) for NASA, the mission aims to deepen our understanding of the Sun and solar wind and how they affect humanity’s technology on Earth and our continued exploration of the solar system.
      Successful solar array testing brings the spacecraft another step toward readiness for launch. The agency’s PUNCH mission is targeting liftoff as a rideshare with NASA’s SPHEREx (Spectro-Photometer for the History of the Universe, Epoch of Reionization and Ices Explorer) on a SpaceX Falcon 9 rocket from Vandenberg’s Space Launch Complex 4E no earlier than Thursday, Feb. 27.
      Image credit: USSF 30th Space Wing/Antonio Ramos
      View the full article
  • Check out these Videos

×
×
  • Create New...