Members Can Post Anonymously On This Site
Fairing Separation
-
Similar Topics
-
By Space Force
The Department of the Air Force released additional guidance for implementation of Executive Order 14183, "Prioritizing Military Excellence and Readiness,"
View the full article
-
By European Space Agency
As preparations to launch Europe’s first MetOp Second Generation, MetOp-SG-A1 satellite continue on track, the team at Europe’s Spaceport in Kourou, French Guiana, has bid a heartfelt farewell to this precious satellite as it was sealed from view within the Ariane 6 rocket’s fairing.
This all-new weather satellite, which hosts the first Copernicus Sentinel-5 instrument, is set to take to the skies on 13 August at 02:37 CEST (12 August 21:37 Kourou time).
View the full article
-
By NASA
NASA/Kevin O’Brien NASA’s SLS (Space Launch System) solid rocket boosters are the largest, most powerful solid propellant boosters to ever fly. Standing 17 stories tall and burning approximately six tons of propellant every second, each booster generates 3.6 million pounds of a thrust for a total of 7.2 million pounds: more thrust than 14 four-engine jumbo commercial airliners. Together, the SLS twin boosters provide more than 75 percent of the total thrust at launch. Each booster houses eight booster separation motors which are responsible for separating the boosters from the core stage during flight.
At the top of each booster is the frustum—a truncated cone-shaped structure that, along with the nose cone, forms the aerodynamic fairing. This frustum houses four of the separation motors, while the remaining four are located at the bottom within the aft skirt.
Image Credit: NASA/Kevin O’Brien
For more information on the Artemis Campaign, visit:
https://www.nasa.gov/feature/artemis/
News Media Contact
Jonathan Deal
Marshall Space Flight Center, Huntsville, Ala.
256-544-0034
jonathan.e.deal@nasa.gov
View the full article
-
By Space Force
On May 23, the Department of the Air Forcereleased updated guidance for implementation of Executive Order 14183, ‘Prioritizing Military Excellence and Readiness, aligning with updated Department of Defense policy and addressing medical standards, accession, retention, and administrative processes for transgender Airmen and Guardians.
View the full article
-
By European Space Agency
With the launch of ESA’s Biomass satellite scheduled for 29 April, preparations at Europe’s Spaceport in Kourou, French Guiana, have reached a key milestone. The satellite has now been sealed inside the protective fairing of the Vega-C rocket – now hidden from view, the satellite is almost ready for its journey into space.
View the full article
-
-
Check out these Videos
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.