Jump to content

Recommended Posts

  • Publishers
Posted

8 min read

Preparations for Next Moonwalk Simulations Underway (and Underwater)

Map of the United States with pins representing each Moon Tree stewards location

Artemis I Moon Tree seedlings continue to find new homes with schools, museums, libraries, universities, and community organizations across the contiguous United States. An open call to NASA’s Artifacts Module in Fall, 2023 welcomed over 1000 organization submissions, which were reviewed and ranked by a joint USDA Forest Service and NASA panel.

Final recipient selection and seedling assignments for each cycle are informed by rank and region, and subject to a limited inventory of trees germinated from each of the five species of seeds flown aboard Artemis I in 2022. Recipient selection and seedling distribution follows four cycles: Spring 2024, Fall 2024, Spring 2025, and Fall 2025.

Spring 2024 Artemis I Moon Tree Stewards

Alabama

Fairfield City Schools – Fairfield High Preparatory School Fairfield AL American Sweetgum
Meridianville Middle School Hazel Green AL Loblolly Pine
Pioneer Museum of Alabama Troy AL Loblolly Pine
Troy University Arboretum Troy AL Loblolly Pine

Arkansas

Baxter County Library Mountain Home AR American Sweetgum

Arizona

University of Arizona – Lunar and Planetary Laboratory (LPL) Tucson AZ American Sweetgum

California

Forestr.org Castro Valley CA Sequoia
Girl Scout Troop 7574 Dana Point CA Sequoia
Greenfield Union School District Greenfield CA Sequoia
Quest Science Center Livermore CA Sequoia
Santiago STEAM Magnet Elementary School Lake Forest CA Sequoia

Colorado

United States Air Force Academy USAF Academy CO American Sweetgum

Connecticut

New Milford High School New Milford CT American Sweetgum
South School – New Canaan School District New Canaan CT Sycamore
Yale University Marsh Botanical Garden New Haven CT American Sweetgum

Washington, DC

United States Capitol
Washington, DC DC American Sweetgum

Florida

Agricultural Biotechnology Academy, West Florida High School of Advanced Technology, Escambia County School District Pensacola FL Loblolly Pine
Cornerstone Learning Community Tallahassee FL American Sweetgum
Dreamers Academy Sarasota FL American Sweetgum
Florida Forest Service Tallahassee FL Loblolly Pine
Florida Polytechnic University Lakeland FL American Sweetgum
Gulfside Community Partnership School Holiday FL Loblolly Pine
H.B. Plant High School Tampa FL American Sweetgum
Hobbs Middle School Milton FL American Sweetgum
Lawton Environmental Study Area (LESA), T.W. Lawton Elementary Oviedo FL American Sweetgum
Montverde Academy Montverde FL American Sweetgum
Museum of Archaeology, Paleontology & Science New Port Richey FL American Sweetgum
Museum of Science and Industry Tampa FL American Sweetgum
North Andrews Gardens Elementary Oakland Park FL American Sweetgum
Orange Park Elementary Orange Park FL American Sweetgum
Pine Crest School Fort Lauderdale FL American Sweetgum
Port Malabar Elementary School Palm Bay FL American Sweetgum
St. Peter Catholic School Deland FL Loblolly Pine
UF/IFAS Extension Clay County 4-H Green Cove Springs FL Loblolly Pine
University of West Florida Pensacola FL Loblolly Pine
West Navarre Intermediate School Navarre FL American Sweetgum

Georgia

Berrien Elementary School Nashville GA Loblolly Pine
East Georgia State College Swainsboro GA Loblolly Pine
Lilburn Elementary School Lilburn GA Loblolly Pine
Park Elementary School Hamilton GA Loblolly Pine
Sagamore Hills Elementary School Atlanta GA Loblolly Pine
United States Air Force Moody Air Force Base GA American Sweetgum

Iowa

Cedar Rapids Community School District, Metro High School Cedar Rapids IA Sycamore

Idaho

American Falls High School American Falls ID Sycamore

Illinois

Eagle Pointe Elementary School Plainfield IL Sycamore
Marion Community Unit #2 School District, Marion Junior High School Marion IL Sycamore
Monmouth College Monmouth IL American Sweetgum

Indiana

Franklin Community High School Franklin IN American Sweetgum
Hayes Arboretum Richmond IN American Sweetgum

Kansas

Tecumseh South Elementary School Tecumseh KS American Sweetgum

Kentucky

Christian County Middle School Hopkinsville KY American Sweetgum
FIND Outdoors Gladie Visitor Center, Red River Gorge Stanton KY American Sweetgum
Graves County High School Mayfield KY American Sweetgum
Martha Layne Collins High School Shelbyville KY American Sweetgum

Louisiana

Shreve Island Elementary, Caddo Parish Schools Shreveport LA American Sweetgum
YMCA of Bogalusa Bogalusa LA Loblolly Pine

Massachusetts

Bernardston Elementary School Bernardston MA American Sweetgum

Michigan

The Botanic Garden at Historic Barns Park Traverse City MI Sycamore

Minnesota

Forest Lake Area High School Forest Lake MN Sycamore

Missouri

Columbia Public Schools Elementary Gifted Program Columbia MO American Sweetgum
Trailridge Elementary Lee’s Summit MO American Sweetgum

Mississippi

Bayou Academy Cleveland MS American Sweetgum
Clinton Community Nature Center Clinton MS American Sweetgum

North Carolina

Cardinal Gibbons High School Raleigh NC American Sweetgum
FIND Outdoors Cradle of Forestry Pisgah National Forest NC American Sweetgum
Mars Hill University Mars Hill NC American Sweetgum
Montgomery County NC Extension Master Gardener Volunteers; The Gathering Garden Mount Gilead NC Loblolly Pine
North Carolina Executive Mansion – Governor’s Residence
Raleigh NC Loblolly Pine
North Carolina School of Science and Mathematics – Morganton Morganton NC American Sweetgum
White Oak High School Jacksonville NC American Sweetgum
North Carolina School of Science and Mathematics – Durham Durham NC Sycamore

Nebraska

Hastings College Hastings NE American Sweetgum
University of Nebraska-Lincoln Lincoln NE American Sweetgum

New Hampshire

Barnstead Elementary School Center Barnstead NH Sycamore
Nashua Community College Nashua NH Sycamore

New Jersey

Edelman Planetarium at Rowan University Glassboro NJ American Sweetgum
Information Age Learning Center Wall Township NJ American Sweetgum

New Mexico

New Mexico Farm & Ranch Heritage Museum Las Cruces NM Loblolly Pine

New York

Baldwinsville Central School District Baldwinsville NY Sycamore
Bronx Community College Bronx NY Sycamore
Franklin Middle School, Kenmore-Town of Tonawanda School District Town of Tonawanda NY Sycamore
Pembroke Junior/Senior High School Corfu NY American Sweetgum
Rome City School District Rome NY Sequoia
State University of New York (SUNY) – New Paltz New Paltz NY American Sweetgum
Suffolk County Vanderbilt Museum and Planetarium Centerport NY American Sweetgum

Ohio

Claymont High School Uhrichsville OH Sycamore
Coldwater Exempted Village Schools Coldwater OH American Sweetgum
Copley-Fairlawn Middle School, Copley-Fairlawn City Schools Copley OH Sycamore
Liberty-Benton High School Findlay OH Sycamore
Marshall STEMM Academy Toledo OH American Sweetgum
Portsmouth City Schools Portsmouth OH American Sweetgum
Pymatuning Valley High School Andover OH American Sweetgum
Wayne National Forest Nelsonville OH American Sweetgum

Oklahoma

Centennial Middle School Broken Arrow OK Loblolly Pine
Jenks Northwest Elementary School Tulsa OK American Sweetgum
Perkins Public Library: Thomas – Wilhite Memorial Library Perkins OK American Sweetgum

Oregon

Crow Middle School Eugene OR American Sweetgum
Friends of Myrtle Creek Library Myrtle Creek OR American Sweetgum
Lent Elementary School Portland OR American Sweetgum
Tamarack Elementary School Hillsboro OR American Sweetgum
Willamette Elementary School, McMinnville School District McMinnville OR American Sweetgum

Pennsylvania

Allegheny Observatory, University of Pittsburgh Pittsburgh PA American Sweetgum
Montour High School McKees Rocks PA American Sweetgum
Penn State University, Penn State Erie – The Behrend College Erie PA American Sweetgum
Penn State University, Penn State Schuylkill University Park PA Sycamore
Perkiomen Valley Middle School East Collegeville PA American Sweetgum
The Reading Public Museum Reading PA Sycamore

Rhode Island

Tiverton Public Library Tiverton RI American Sweetgum

South Carolina

Academy for the Arts, Science, & Technology Myrtle Beach SC Loblolly Pine
Conway Elementary School Conway SC American Sweetgum
Manning Early Childhood Center, Clarendon School District Manning SC American Sweetgum
Spartanburg Community College Horticulture Program Spartanburg SC American Sweetgum

Tennessee

Great Smoky Mountain Council, Boy Scouts of America Knoxville TN American Sweetgum
Lipscomb Academy Nashville TN American Sweetgum
Pellissippi State Community College Knoxville TN Loblolly Pine
Sumner Academy Gallatin TN American Sweetgum

Texas

Atlanta Public Library Atlanta TX American Sweetgum
Beaumont Children’s Museum & Beaumont Botanical Gardens Beaumont TX Loblolly Pine
Bonham Pre-Kindergarten School San Marcos TX Loblolly Pine
Charles W. Young Junior High School Arlington TX Loblolly Pine
Clear Creek Intermediate, Clear Creek Independent School District (CCISD) League City TX American Sweetgum
Dallas Arboretum and Botanical Garden – Children’s Adventure Garden Dallas TX American Sweetgum
DeKalb Independent School District De Kalb TX Loblolly Pine
Doss Consolidated Common School District (CCSD) Doss TX American Sweetgum
Fort Worth Botanic Garden Fort Worth TX Loblolly Pine
Galveston County 4H Texas A&M AgriLife Extension Program (Houston Botanic Gardens) Houston TX American Sweetgum
Goliad Independent School District Goliad TX Loblolly Pine
Greens Prairie Elementary School College Station TX American Sweetgum
Groves Elementary School Humble TX Loblolly Pine
Kay Granger Elementary School Fort Worth TX Loblolly Pine
Leadership Big Bend, Nopalitos Park Alpine TX American Sweetgum
Science Hall Elementary School Kyle TX American Sweetgum
Scobee Education Center at San Antonio College San Antonio TX Loblolly Pine
Space Center Intermediate, Clear Creek Independent School District (CCISD) Houston TX Loblolly Pine
Texas A&M Forest Service Conroe TX American Sweetgum
Texas A&M University, Physics & Astronomy Department College Station TX American Sweetgum
University of Texas at Arlington Arlington TX American Sweetgum
Uplift Summit International Preparatory Middle School Arlington TX Loblolly Pine
Westside Elementary School Cedar Park TX Loblolly Pine
Zilker Botanical Garden Conservancy Austin TX Loblolly Pine

Utah

Southern Utah University STEM Center Cedar City UT American Sweetgum

Virginia

Essex County Museum Tappahannock VA American Sweetgum
Virginia Living Museum Newport News VA Loblolly Pine
Virginia Zoo Norfolk VA Loblolly Pine

Washington

Innovation Lab High School Bothell WA Sycamore
Orchard Prairie School District Spokane WA Sycamore
Richland School District Richland WA Sycamore
Upper Columbia Resource Conservation & Development Council Spokane Valley WA Sycamore
Yakima Area Arboretum Yakima WA Sycamore

Wisconsin

Dunn County Historical Society Menomonie WI Sycamore

Fall 2024 Artemis I Moon Tree Stewards
Distribution is underway through November 2024. This list will be updated once distribution is complete. Previously notified recipients who have not received a seedling may be deferred to a later cycle based on current ready-to-ship seedling inventory.
Spring 2025 Artemis I Moon Tree Stewards
Selection is in progress.
Fall 2025 Artemis I Moon Tree Stewards
Selection is in progress.

View the full article

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      Teams at NASA’s Michoud Assembly Facility in New Orleans move a liquid hydrogen tank for the agency’s SLS (Space Launch System) rocket into the factory’s final assembly area on April 22, 2025. The propellant tank is one of five major elements that make up the 212-foot-tall rocket stage. NASA/Steven Seipel NASA completed another step to ready its SLS (Space Launch System) rocket for the Artemis III mission as crews at the agency’s Michoud Assembly Facility in New Orleans recently applied a thermal protection system to the core stage’s liquid hydrogen tank.
      Building on the crewed Artemis II flight test, Artemis III will add new capabilities with the human landing system and advanced spacesuits to send the first astronauts to explore the lunar South Pole region and prepare humanity to go to Mars. Thermal protection systems are a cornerstone of successful spaceflight endeavors, safeguarding human life, and enabling the launch and controlled return of spacecraft.
      The tank is the largest piece of SLS flight hardware insulated at Michoud. The hardware requires thermal protection due to the extreme temperatures during launch and ascent to space – and to keep the liquid hydrogen at minus 423 degrees Fahrenheit on the pad prior to launch.
      “The thermal protection system protects the SLS rocket from the heat of launch while also keeping the thousands of gallons of liquid propellant within the core stage’s tanks cold enough. Without the protection, the propellant would boil off too rapidly to replenish before launch,” said Jay Bourgeois, thermal protection system, test, and integration lead at NASA Michoud. “Thermal protection systems are crucial in protecting all the structural components of SLS during launch and flight.”
      In February, Michoud crews with NASA and Boeing, the SLS core stage prime contractor, completed the thermal protection system on the external structure of the rocket’s liquid hydrogen propellant fuel tank, using a robotic tool in what is now the largest single application in spaceflight history. The robotically controlled operation coated the tank with spray-on foam insulation, distributing 107 feet of the foam to the tank in 102 minutes. When the foam is applied to the core stage, it gives the rocket a canary yellow color. The Sun’s ultraviolet rays naturally “tan” the thermal protection, giving the SLS core stage its signature orange color, like the space shuttle external tank.
      Having recently completed application of the thermal protection system, teams will now continue outfitting the 130-foot-tall liquid hydrogen tank with critical systems to ready it for its designated Artemis III mission. The core stage of SLS is the largest ever built by length and volume, and was manufactured at Michoud using state-of-the-art manufacturing equipment. (NASA/Steven Seipel) While it might sound like a task similar to applying paint to a house or spraying insulation in an attic, it is a much more complex process. The flexible polyurethane foam had to withstand harsh conditions for application and testing. Additionally, there was a new challenge: spraying the stage horizontally, something never done previously during large foam applications on space shuttle external tanks at Michoud. All large components of space shuttle tanks were in a vertical position when sprayed with automated processes.
      Overall, the rocket’s core stage is 212 feet with a diameter of 27.6 feet, the same diameter as the space shuttle’s external tank. The liquid hydrogen and liquid oxygen tanks feed four RS-25 engines for approximately 500 seconds before SLS reaches low Earth orbit and the core stage separates from the upper stage and NASA’s Orion spacecraft.
      “Even though it only takes 102 minutes to apply the spray, a lot of careful preparation and planning is put into this process before the actual application of the foam,” said Boeing’s Brian Jeansonne, the integrated product team senior leader for the thermal protection system at NASA Michoud. “There are better process controls in place than we’ve ever had before, and there are specialized production technicians who must have certifications to operate the system. It’s quite an accomplishment and a lot of pride in knowing that we’ve completed this step of the build process.”
      The core stage of SLS is the largest NASA has ever built by length and volume, and it was manufactured at Michoud using state-of-the-art manufacturing equipment. Michoud is a unique, advanced manufacturing facility where the agency has built spacecraft components for decades, including the space shuttle’s external tanks and Saturn V rockets for the Apollo program.
      Through Artemis, NASA will send astronauts to explore the Moon for scientific discovery, economic benefits, and build the foundation for the first crewed missions to Mars.
      For more information on the Artemis Campaign, visit:
      https://www.nasa.gov/feature/artemis/
      News Media Contact
      Jonathan Deal
      Marshall Space Flight Center, Huntsville, Ala. 
      256-544-0034 
      jonathan.e.deal@nasa.gov
      View the full article
    • By NASA
      5 min read
      Preparations for Next Moonwalk Simulations Underway (and Underwater)
      ICON’s next generation Vulcan construction system 3D printing a simulated Mars habitat for NASA’s Crew Health and Performance Exploration Analog (CHAPEA) missions.ICON One of the keys to a sustainable human presence on distant worlds is using local, or in-situ, resources which includes building materials for infrastructure such as habitats, radiation shielding, roads, and rocket launch and landing pads. NASA’s Space Technology Mission Directorate is leveraging its portfolio of programs and industry opportunities to develop in-situ, resource capabilities to help future Moon and Mars explorers build what they need. These technologies have made exciting progress for space applications as well as some impacts right here on Earth. 
      The Moon to Mars Planetary Autonomous Construction Technology (MMPACT) project, funded by NASA’s Game Changing Development program and managed at the agency’s Marshall Space Flight Center in Huntsville, Alabama, is exploring applications of large-scale, robotic 3D printing technology for construction on other planets. It sounds like the stuff of science fiction, but demonstrations using simulated lunar and Martian surface material, known as regolith, show the concept could become reality. 
      Lunar 3D printing prototype.Contour Crafting With its partners in industry and academic institutions, MMPACT is developing processing technologies for lunar and Martian construction materials. The binders for these materials, including water, could be extracted from the local regolith to reduce launch mass. The regolith itself is used as the aggregate, or granular material, for these concretes. NASA has evaluated these materials for decades, initially working with large-scale 3D printing pioneer, Dr. Behrokh Khoshnevis, a professor of civil, environmental and astronautical engineering at the University of Southern California in Los Angeles.  
      Khoshnevis developed techniques for large-scale extraterrestrial 3D printing under the NASA Innovative Advanced Concepts (NIAC) program. One of these processes is Contour Crafting, in which molten regolith and a binding agent are extruded from a nozzle to create infrastructure layer by layer. The process can be used to autonomously build monolithic structures like radiation shielding and rocket landing pads. 
      Continuing to work with the NIAC program, Khoshnevis also developed a 3D printing method called selective separation sintering, in which heat and pressure are applied to layers of powder to produce metallic, ceramic, or composite objects which could produce small-scale, more-precise hardware. This energy-efficient technique can be used on planetary surfaces as well as in microgravity environments like space stations to produce items including interlocking tiles and replacement parts. 
      While NASA’s efforts are ultimately aimed at developing technologies capable of building a sustainable human presence on other worlds, Khoshnevis is also setting his sights closer to home. He has created a company called Contour Crafting Corporation that will use 3D printing techniques advanced with NIAC funding to fabricate housing and other infrastructure here on Earth.  
      Another one of NASA’s partners in additive manufacturing, ICON of Austin, Texas, is doing the same, using 3D printing techniques for home construction on Earth, with robotics, software, and advanced material.  
      Construction is complete on a 3D-printed, 1,700-square-foot habitat that will simulate the challenges of a mission to Mars at NASA’s Johnson Space Center in Houston, Texas. The habitat will be home to four intrepid crew members for a one-year Crew Health and Performance Analog, or CHAPEA, mission. The first of three missions begins in the summer of 2023. The ICON company was among the participants in NASA’s 3D-Printed Habitat Challenge, which aimed to advance the technology needed to build housing in extraterrestrial environments. In 2021, ICON used its large-scale 3D printing system to build a 1,700 square-foot simulated Martian habitat that includes crew quarters, workstations and common lounge and food preparation areas. This habitat prototype, called Mars Dune Alpha, is part of NASA’s ongoing Crew Health and Performance Exploration Analog, a series of Mars surface mission simulations scheduled through 2026 at NASA’s Johnson Space Center in Houston.  
      With support from NASA’s Small Business Innovation Research program, ICON is also developing an Olympus construction system, which is designed to use local resources on the Moon and Mars as building materials. 
      The ICON company uses a robotic 3D printing technique called Laser Vitreous Multi-material Transformation, in which high-powered lasers melt local surface materials, or regolith, that then solidify to form strong, ceramic-like structures. Regolith can similarly be transformed to create infrastructure capable of withstanding environmental hazards like corrosive lunar dust, as well as radiation and temperature extremes.  
      The company is also characterizing the gravity-dependent properties of simulated lunar regolith in an experiment called Duneflow, which flew aboard a Blue Origin reusable suborbital rocket system through NASA’s Flight Opportunities program in February 2025. During that flight test, the vehicle simulated lunar gravity for approximately two minutes, enabling ICON and researchers from NASA to compare the behavior of simulant against real regolith obtained from the Moon during an Apollo mission.    
      Learn more: https://www.nasa.gov/space-technology-mission-directorate/  
      Facebook logo @NASATechnology @NASA_Technology Keep Exploring Discover More …
      Space Technology Mission Directorate
      NASA Innovative Advanced Concepts
      STMD Solicitations and Opportunities
      Technology
      Share
      Details
      Last Updated May 13, 2025 EditorLoura Hall Related Terms
      Space Technology Mission Directorate NASA Innovative Advanced Concepts (NIAC) Program Technology View the full article
    • By NASA
      Artemis II crew members, shown inside the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida, stand in front of their Orion crew module on Aug. 8, 2023. Pictured from left are CSA (Canadian Space Agency) astronaut Jeremy Hansen, and NASA astronauts Victor Glover, Reid Wiseman, and Christina Koch.Credit: NASA/Kim Shiflett NASA will host a live Twitch event to highlight the ongoing Moon Mascot Challenge, which invites the public to design a zero gravity indicator for the agency’s Artemis II crewed test flight around the Moon. Viewers will have the opportunity to provide real-time input to an artist who will create an example of a zero gravity indicator during the livestream. 
      Zero gravity indicators are small, plush items carried aboard spacecraft to provide a visual indication of when the crew reaches space.
      The event will begin at 3 p.m. EDT on Tuesday, May 13, on the agency’s official Twitch channel:
      https://www.twitch.tv/nasa
      The contest invites global creators of all ages to submit design ideas for a zero gravity indicator that will fly aboard the agency’s Artemis II test flight, the first crewed mission under NASA’s Artemis campaign.
      Up to 25 finalists, including entries from a K-12 student division, will be selected. The Artemis II crew will choose one design that NASA’s Thermal Blanket Lab will fabricate to fly alongside the crew in the Orion spacecraft.
      During this Twitch event, NASA experts will discuss the Moon Mascot Challenge while the artist incorporates live audience feedback into a sample design. Although the design example will not be eligible for the contest, it will demonstrate how challenge participants can develop their own zero gravity indicator designs. The example will be shared on the @NASAArtemis social media accounts following the Twitch event.
      The Artemis II test flight will take NASA astronauts Reid Wiseman, Victor Glover, and Christina Koch, and CSA (Canadian Space Agency) astronaut Jeremy Hansen on a 10-day journey around the Moon and back. The mission is another step toward missions on the lunar surface to help the agency prepare for future human missions to Mars.
      To learn more about NASA’s missions, visit:
      https://www.nasa.gov
      -end-
      Rachel Kraft
      Headquarters, Washington
      202-358-1600
      rachel.h.kraft@nasa.gov
      Share
      Details
      Last Updated May 12, 2025 EditorJessica TaveauLocationNASA Headquarters Related Terms
      Artemis 2 Earth's Moon Exploration Systems Development Mission Directorate Social Media View the full article
    • By NASA
      Technicians move the Orion spacecraft for NASA’s Artemis II test flight out of the Neil A. Armstrong Operations and Checkout Building to the Multi-Payload Processing Facility at Kennedy Space Center in Florida on Saturday, May 3, 2025. NASA/Kim Shiflett Engineers, technicians, mission planners, and the four astronauts set to fly around the Moon next year on Artemis II, NASA’s first crewed Artemis mission, are rapidly progressing toward launch.

      At the agency’s Kennedy Space Center in Florida, teams are working around the clock to move into integration and final testing of all SLS (Space Launch System) and Orion spacecraft elements. Recently they completed two key milestones – connecting the SLS upper stage with the rest of the assembled rocket and moving Orion from its assembly facility to be fueled for flight.

      “We’re extremely focused on preparing for Artemis II, and the mission is nearly here,” said Lakiesha Hawkins, assistant deputy associate administrator for NASA’s Moon to Mars Program, who also will chair the mission management team during Artemis II. “This crewed test flight, which will send four humans around the Moon, will inform our future missions to the Moon and Mars.”
      Teams with NASA’s Exploration Ground Systems Program begin integrating the interim cryogenic propulsion stage to the SLS (Space Launch System) launch vehicle stage adapter on Wednesday, April 30, 2025, inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. NASA/Isaac Watson On May 1, technicians successfully attached the interim cryogenic propulsion stage to the SLS rocket elements already poised atop mobile launcher 1, including its twin solid rocket boosters and core stage, inside the spaceport’s Vehicle Assembly Building (VAB). This portion of the rocket produces 24,750 pounds of thrust for Orion after the rest of the rocket has completed its job. Teams soon will move into a series of integrated tests to ensure all the rocket’s elements are communicating with each other and the Launch Control Center as expected. The tests include verifying interfaces and ensuring SLS systems work properly with the ground systems.

      Meanwhile, on May 3, Orion left its metaphorical nest, the Neil Armstrong Operations & Checkout Facility at Kennedy, where it was assembled and underwent initial testing. There the crew module was outfitted with thousands of parts including critical life support systems for flight and integrated with the service module and crew module adapter. Its next stop on the road to the launch pad is the Multi-Payload Processing Facility, where it will be carefully fueled with propellants, high pressure gases, coolant, and other fluids the spacecraft and its crew need to maneuver in space and carry out the mission.

      After fueling is complete, the four astronauts flying on the mission around the Moon and back over the course of approximately 10 days, will board the spacecraft in their Orion Crew Survival System spacesuits to test all the equipment interfaces they will need to operate during the mission. This will mark the first time NASA’s Reid Wiseman, Victor Glover, and Christina Koch, and CSA (Canadian Space Agency) astronaut Jeremy Hansen, will board their actual spacecraft while wearing their spacesuits. After the crewed testing is complete, technicians will move Orion to Kennedy’s Launch Abort System Facility, where the critical escape system will be added. From there, Orion will move to the VAB to be integrated with the fully assembled rocket.

      NASA also announced its second agreement with an international space agency to fly a CubeSat on the mission. The collaborations provide opportunities for other countries to work alongside NASA to integrate and fly technology and experiments as part of the agency’s Artemis campaign.

      While engineers at Kennedy integrate and test hardware with their eyes on final preparations for the mission, teams responsible for launching and flying the mission have been busy preparing for a variety of scenarios they could face.

      The launch team at Kennedy has completed more than 30 simulations across cryogenic propellant loading and terminal countdown scenarios. The crew has been taking part in simulations for mission scenarios, including with teams in mission control. In April, the crew and the flight control team at NASA’s Johnson Space Center in Houston simulated liftoff through a planned manual piloting test together for the first time. The crew also recently conducted long-duration fit checks for their spacesuits and seats, practicing several operations while under various suit pressures.
      NASA astronaut Christina Koch participates in a fit check April 18, 2025, in the spacesuit she will wear during Artemis II. NASA/Josh Valcarcel Teams are heading into a busy summer of mission preparations. While hardware checkouts and integration continue, in coming months the crew, flight controllers, and launch controllers will begin practicing their roles in the mission together as part of integrated simulations. In May, the crew will begin participating pre-launch operations and training for emergency scenarios during launch operations at Kennedy and observe a simulation by the launch control team of the terminal countdown portion of launch. In June, recovery teams will rehearse procedures they would use in the case of a pad or ascent abort off the coast of Florida, with launch and flight control teams supporting. The mission management team, responsible for reviewing mission status and risk assessments for issues that arise and making decisions about them, also will begin practicing their roles in simulations. Later this summer, the Orion stage adapter will arrive at the VAB from NASA’s Marshall Spaceflight Center in Huntsville, Alabama, and stacked on top of the rocket.

      NASA astronauts Reid Wiseman (foreground) and Victor Glover participate in a simulation of their Artemis II entry profile on March 13, 2025.NASA/Bill Stafford Through Artemis, NASA will send astronauts to explore the Moon for scientific discovery, economic benefits, and build the foundation for the first crewed missions to Mars.
      View the full article
    • By NASA
      Researchers with NASA’s Exploration Research and Technology programs conduct molten regolith electrolysis testing inside Swamp Works at NASA’s Kennedy Space Center in Florida on Thursday, Dec. 5, 2024.NASA/Kim Shiflett As NASA works to establish a long-term presence on the Moon, researchers have reached a breakthrough by extracting oxygen at a commercial scale from simulated lunar soil at Swamp Works at NASA’s Kennedy Space Center in Florida. The achievement moves NASA one step closer to its goal of utilizing resources on the Moon and beyond instead of relying only on supplies shipped from Earth.
      NASA Kennedy researchers in the Exploration Research and Technology programs teamed up with Lunar Resources Inc. (LUNAR), a space industrial company in Houston, Texas, to perform molten regolith electrolysis. Researchers used the company’s resource extraction reactor, called LR-1, along with NASA Kennedy’s vacuum chamber. During the recent vacuum chamber testing, molecular oxygen was measured in its pure form along with the production of metals from a batch of dust and rock that simulates lunar soil, often referred to as “regolith,” in the industry.
      “This is the first time NASA has produced molecular oxygen using this process,” said Dr. Annie Meier, molten regolith electrolysis project manager at NASA Kennedy. “The process of heating up the reactor is like using an elaborate cooking pot. Once the lid is on, we are essentially watching the gas products come out.”
      During testing, the vacuum environment chamber replicated the vacuum pressure of the lunar surface. The extraction reactor heated about 55 pounds (25 kilograms) of simulated regolith up to a temperature of 3100°F (1700°C) until it melted. Researchers then passed an electric current through the molten regolith until oxygen in a gas form was separated from the metals of the soil. They measured and collected the molecular oxygen for further study.
      In addition to air for breathing, astronauts could use oxygen from the Moon as a propellant for NASA’s lunar landers and for building essential infrastructure. This practice of in-situ resource utilization (ISRU) also decreases the costs of deep space exploration by reducing the number of resupply missions needed from Earth.
      Once the process is perfected on Earth, the reactor and its subsystems can be delivered on future missions to the Moon. Lunar rovers, similar to NASA’s ISRU Pilot Excavator, could autonomously gather the regolith to bring back to the reactor system to separate the metals and oxygen.
      “Using this unique chemical process can produce the oxidizer, which is half of the propellant mix, and it can create vital metals used in the production of solar panels that in turn could power entire lunar base stations,” said Evan Bell, mechanical structures and mechatronics lead at NASA Kennedy.
      Post-test data analysis will help the NASA and LUNAR teams better understand the thermal and chemical function of full-scale molten regolith electrolysis reactors for the lunar surface. The vacuum chamber and reactor also can be upgraded to represent other locations of the lunar environment as well as conditions on Mars for further testing.
      Researchers at NASA Kennedy began developing and testing molten regolith electrolysis reactors in the early 1990s. Swamp Works is a hands-on learning environment facility at NASA Kennedy that takes ideas through development and into application to benefit space exploration and everyone living on Earth. From 2019 to 2023, Swamp Works developed an early concept reactor under vacuum conditions named Gaseous Lunar Oxygen from Regolith Electrolysis (GaLORE). Scientists at NASA’s Johnson Space Center in Houston conducted similar testing in 2023, removing carbon monoxide from simulated lunar regolith in a vacuum chamber.
      “We always say that Kennedy Space Center is Earth’s premier spaceport, and this breakthrough in molten regolith electrolysis is just another aspect of us being the pioneers in providing spaceport capabilities on the Moon, Mars, and beyond,” Bell said.
      NASA’s Exploration Research and Technology programs, related laboratories, and research facilities develop technologies that will enable human deep space exploration. NASA’s Game Changing Development program, managed by the agency’s Space Technology Mission Directorate funded the project.
      View the full article
  • Check out these Videos

×
×
  • Create New...