Jump to content

40 Years Ago: Space Shuttle Discovery Makes its Public Debut


Recommended Posts

  • Publishers
Posted

On Oct. 16, 1983, NASA’s newest space shuttle, Discovery, made its public debut during a rollout ceremony at its manufacturing plant in Palmdale, California. Under construction for three years, Discovery joined NASA’s other two space-worthy orbiters, Columbia and Challenger, and atmospheric test vehicle Enterprise. The rollout ceremony, attended by NASA and other officials, also featured the astronauts assigned to Discovery’s first mission, STS-41D, then planned for launch in June 1984. By the time NASA retired Discovery in 2011, it had flown 39 missions, more than any other orbiter, in a career spanning 26 years and flying every type of mission envisioned for the space shuttle. The Smithsonian Institution’s National Air and Space Museum has Discovery on display at its Stephen F. Udvar-Hazy Center in Chantilly, Virginia.

Space shuttle Discovery under construction at Rockwell International’s Palmdale, California, plant in  August 1982 Space shuttle Discovery under construction at Rockwell International’s Palmdale, California, plant in September 1982 Space shuttle Discovery under construction at Rockwell International’s Palmdale, California, plant in April 1983.
Space shuttle Discovery under construction at Rockwell International’s Palmdale, California, plant in  August 1982, left, September 1982, and April 1983.

On Jan. 25, 1979, NASA announced the names of the first four space-worthy orbiters – Columbia, Challenger, Discovery, and Atlantis. Like the other vehicles, NASA named Discovery after historical vessels of exploration – Captain James Cook’s HMS Discovery used during his third and final voyage (1776-1779) and Henry Hudson’s Discovery used during his 1610-1611 search for the Northwest Passage. On Jan. 29, NASA signed the contract with Rockwell International of Downey, California, to build and deliver Discovery. Construction began in June 1980 and finished in February 1983. The newest orbiter included several upgrades from the two earlier vehicles, and through more extensive use of blankets instead of tiles in the thermal protection system, weighed 6,870 pounds less than Columbia. After completion of systems testing, workers prepared Discovery for its first public appearance.

: Overhead view of space shuttle Discovery during the rollout ceremony at Rockwell International’s Palmdale, California, plant The astronauts assigned to Discovery’s first mission, STS-41D, speak to the assembled crowd Five of the six STS-41D crew members, Richard M. “Mike” Mullane, kneeling left, Steven A. Hawley, Henry W. “Hank” Hartsfield, standing left, Judith A. Resnik, and Michael L. Coats, pose with Discovery as a backdrop
Left: Overhead view of space shuttle Discovery during the rollout ceremony at Rockwell International’s Palmdale, California, plant. Middle: The astronauts assigned to Discovery’s first mission, STS-41D, speak to the assembled crowd. Right: Five of the six STS-41D crew members, Richard M. “Mike” Mullane, kneeling left, Steven A. Hawley, Henry W. “Hank” Hartsfield, standing left, Judith A. Resnik, and Michael L. Coats, pose with Discovery as a backdrop.

The rollout ceremony for Discovery took place on Oct. 16, 1983, at Rockwell International’s Palmdale facility, attended by hundreds of employees and visitors. In addition to NASA and other dignitaries, five of the six the astronauts assigned to Discovery’s first mission also participated, thanking the assembled employees for their hard work in building their spacecraft. They included STS-41D Commander Henry W. “Hank” Hartsfield, Pilot Michael L. Coats, and Mission Specialists Richard M. “Mike” Mullane, Steven A. Hawley, and Judith A. Resnik. Payload Specialist Charles D. Walker could not attend.

Workers tow Discovery the 36 miles from Palmdale to NASA’s Dryden, now Armstrong, Flight Research Center at Edwards Air Force Base in California’s Mojave Desert.
Workers tow Discovery the 36 miles from Palmdale to NASA’s Dryden, now Armstrong, Flight Research Center at Edwards Air Force Base in California’s Mojave Desert.

Space shuttle Discovery atop its Shuttle Carrier Aircraft (SCA) flies over Vandenberg Air Force Base Workers at Vandenberg use Discovery and its SCA to test the Orbiter Lifting Fixture Discovery atop the SCA arrives at NASA’s Kennedy Space Center in Florida
Left: Space shuttle Discovery atop its Shuttle Carrier Aircraft (SCA) flies over Vandenberg Air Force Base. Middle: Workers at Vandenberg use Discovery and its SCA to test the Orbiter Lifting Fixture. Right: Discovery atop the SCA arrives at NASA’s Kennedy Space Center in Florida.

Following the ceremony, workers trucked Discovery 36 miles overland to NASA’s Dryden, now Armstrong, Flight Research Center at Edwards Air Force Base (AFB) in California’s Mojave Desert, the trip taking about 10 hours. In the Mate-Demate Device (MMD), workers placed Discovery atop the Shuttle Carrier Aircraft (SCA), a modified Boeing 747, to begin the ferry flight. The first leg of the journey started on Nov. 6 with a stop at Vandenberg AFB on the California coast, where workers used Discovery and the SCA to test the Orbiter Lifting Fixture, a scaled down version of the MDD planned for use exclusively at Vandenberg. At the time, NASA and the Department of Defense planned to fly space shuttles, with Discovery as the designated orbiter, from Vandenberg’s Space Launch Complex-6 on military polar orbital missions, beginning with STS-62A in 1986. The agencies mothballed those plans following the Challenger accident. From Vandenberg, on Nov. 8 the SCA carried Discovery to Carswell AFB near Ft. Worth for an overnight refueling stop, before continuing to NASA’s Kennedy Space Center in Florida on Nov. 9. The following day, workers towed Discovery to the Orbiter Processing Facility (OPF) for initial receiving inspections. After a move to the nearby Vehicle Assembly Building (VAB) on Dec. 9 for temporary storage, workers returned Discovery to the OPF on Jan. 10, 1984, to begin processing it for its first flight.

In the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida workers prepare to lift Discovery for mating with its External Tank and twin Solid Rocket Boosters The completed stack is ready for its rollout to Launch Pad 39A Space shuttle Discovery begins its rollout from the VAB to Launch Pad 39A.
Left: In the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida workers prepare to lift Discovery for mating with its External Tank and twin Solid Rocket Boosters. Middle: The completed stack is ready for its rollout to Launch Pad 39A. Right: Space shuttle Discovery begins its rollout from the VAB to Launch Pad 39A.

The Flight Readiness Firing of Discovery’s three main engines. With Discovery as a back drop, STS-41D astronauts Michael L. Coats, left, Charles D. Walker, Steven A. Hawley, Judith A. Resnik, Richard M. “Mike” Mullane, and Henry W. “Hank” Hartsfield pose for photographers following the countdown demonstration test The launch abort Discovery finally takes to the skies
Left: The Flight Readiness Firing of Discovery’s three main engines. Middle left: With Discovery as a back drop, STS-41D astronauts Michael L. Coats, left, Charles D. Walker, Steven A. Hawley, Judith A. Resnik, Richard M. “Mike” Mullane, and Henry W. “Hank” Hartsfield pose for photographers following the countdown demonstration test. Middle right: The launch abort. Right: Discovery finally takes to the skies!

Four months later, on May 12, workers towed Discovery from the OPF to the VAB and mated it to an External Tank and twin Solid Rocket Boosters. The entire stack rolled out to Launch Pad 39A on May 19 in preparation for the planned June 25 launch of the STS-41D mission. As with any new orbiter, on June 2 NASA conducted a 20-second Flight Readiness Firing of Discovery’s three main engines. On June 14, the six-person crew participated in a countdown demonstration test. They boarded Discovery on June 25 for a launch attempt that aborted at the T minus nine-minute mark due to a failure of Discovery’s back-up General Purpose Computer. Technicians replaced the failed unit with one from Challenger for another launch attempt the next day. This time Discovery’s onboard computer aborted the launch four seconds before liftoff but after two of the three main engines had already ignited, resulting in some anxious moments in the crew compartment. To ease the tension, Hawley is reported to have said something along the lines of, “Gee, I thought we’d be a little higher when the engines shut off.” To make matters worse, a hydrogen fire at the base of the launch pad activated the fire suppression system, forcing the crew to evacuate the spacecraft under a deluge of water. The problem with the center engine required a replacement that engineers completed at the pad between July 3 and 5. But the delay caused NASA managers to shuffle payloads and launch schedules, and that required Discovery’s return to the VAB on July 14. Workers destacked the orbiter to return it to the OPF for the payload changes. That completed, and after restacking in the VAB, Discovery returned to Launch Pad 39A on Aug. 9 for a launch attempt 20 days later. A hardware problem resulted in a one-day delay, and finally on Aug. 30 Discovery lifted off on its first mission to space.

Space shuttle Discovery in the Smithsonian Institution’s Stephen F. Udvar-Hazy Center of the National Air and Space Museum in Chantilly, Virginia
Space shuttle Discovery in the Smithsonian Institution’s Stephen F. Udvar-Hazy Center of the National Air and Space Museum in Chantilly, Virginia. Image credit: courtesy National Air and Space Museum.

In the course of its 39 missions spanning more than 26 years, Discovery flew virtually every type of mission envisioned for the space shuttle, including government and commercial satellite deployments and retrievals, launching and servicing scientific observatories such as the Hubble Space Telescope, resupplying the Russian Mir space station, and assembling and maintaining the International Space Station. Discovery also flew the return to flight missions after both the Challenger and Columbia accidents. Discovery flew its final mission, STS-133, in February 2011. The following year, the Smithsonian Institution’s National Air and Space Museum placed space shuttle Discovery on display at its Stephen F. Udvar-Hazy Center in Chantilly, Virginia.

View the full article

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By Space Force
      U.S. Space Force Chief of Space Operations Gen. Chance Saltzman and Italian Air Force Chief of Staff Lt. Gen. Luca Goretti signed a statement of understanding.

      View the full article
    • By European Space Agency
      Image: Part of the Italian island of Sardinia is featured in this image captured by the Copernicus Sentinel-2 mission. View the full article
    • By NASA
      NASA astronaut and Expedition 72 flight engineer Anne McClain is pictured near one of the International Space Station’s main solar arrays during a spacewalk.NASA/Nichole Ayers In this May 1, 2025, photo taken by fellow NASA astronaut Nichole Ayers, Anne McClain works near one of the International Space Station’s main solar arrays during a spacewalk. During the May 1 spacewalk – McClain’s third and Ayers’ first – the astronaut pair relocated a space station communications antenna and completed the initial mounting bracket installation steps for an International Space Station Rollout Solar Array, or IROSA, that will arrive on a future SpaceX commercial resupply services mission, in addition to some get ahead tasks.
      Learn more about station activities by following the space station blog.
      Image credit: NASA/Nichole Ayers
      View the full article
    • By European Space Agency
      The activities to assemble the European Space Agency’s Plato mission are progressing well now that 24 of the spacecraft’s 26 cameras have been installed. Once in space, Plato will use its many eyes to survey a very large area of the sky and hunt for terrestrial planets. The spacecraft’s supporting element is also coming together in parallel.
      View the full article
    • By NASA
      One half of NASA’s nearly complete Nancy Grace Roman Space Telescope just passed a lengthy test to ensure it will function properly in the space environment. This milestone keeps Roman well on track for its target launch by May 2027, with the team aiming for as early as fall 2026.
      This photo shows half of the NASA’s Nancy Grace Roman observatory — the outer barrel assembly, deployable aperture cover, and test solar arrays — fully deployed in a thermal chamber at NASA’s Goddard Space Flight Center in Greenbelt, Md., for environmental testing. Credit: NASA/Sydney Rohde “This milestone tees us up to attach the flight solar array sun shield to the outer barrel assembly, and deployable aperture cover, which we’ll begin this month,” said Jack Marshall, who leads integration and testing for these elements at NASA’s Goddard Space Flight Center in Greenbelt, Maryland. “Then we’ll complete remaining environmental tests for the flight assembly before moving on to connect Roman’s two major assemblies and run the full observatory through testing, and then we’ll be ready to launch!”
      Prior to this thermal testing, technicians integrated Roman’s deployable aperture cover, a visor-like sunshade, to the outer barrel assembly, which will house the telescope and instruments, in January, then added test solar panels in March. They moved this whole structure into the Space Environment Simulator test chamber at NASA Goddard in April.
      There, it was subjected to the hot and cold temperatures it will experience in space. Next, technicians will join Roman’s flight solar panels to the outer barrel assembly and sunshade. Then the structure will undergo a suite of assessments, including a shake test to ensure it can withstand the vibrations experienced during launch.
      This photo captures the installation of the test solar panels for NASA’s Nancy Grace Roman Space Telescope, which took place in March. One panel is lifted in the center of the frame on its way to being attached to the outer barrel assembly at right. The deployable aperture cover is stowed on the front of the outer barrel assembly, and the other half of the observatory — the spacecraft and integrated payload assembly, which consists of the telescope, instrument carrier, and two instruments — appears at the left of the photo.Credit: NASA/Jolearra Tshiteya Meanwhile, Roman’s other major portion — the spacecraft and integrated payload assembly, which consists of the telescope, instrument carrier, and two instruments — will undergo its own shake test, along with additional assessments. Technicians will install the lower instrument sun shade and put this half of the observatory through a thermal vacuum test in the Space Environment Simulator.
      “The test verifies the instruments will remain at stable operating temperatures even while the Sun bakes one side of the observatory and the other is exposed to freezing conditions — all in a vacuum, where heat doesn’t flow as readily as it does through air,” said Jeremy Perkins, an astrophysicist serving as Roman’s observatory integration and test scientist at NASA Goddard. Keeping the instrument temperatures stable ensures their readings will be precise and reliable.
      Technicians are on track to connect Roman’s two major parts in November, resulting in a complete observatory by the end of the year. Following final tests, Roman is expected to ship to the launch site at NASA’s Kennedy Space Center in Florida for launch preparations in summer 2026. Roman remains on schedule for launch by May 2027, with the team aiming for launch as early as fall 2026.
      This infographic shows the two major subsystems that make up NASA’s Nancy Grace Roman Space Telescope. The subsystems are each undergoing testing prior to being joined together this fall.Credit: NASA’s Goddard Space Flight Center To virtually tour an interactive version of the telescope, visit:
      https://roman.gsfc.nasa.gov/interactive
      The Nancy Grace Roman Space Telescope is managed at NASA’s Goddard Space Flight Center in Greenbelt, Maryland, with participation by NASA’s Jet Propulsion Laboratory in Southern California; Caltech/IPAC in Pasadena, California; the Space Telescope Science Institute in Baltimore; and a science team comprising scientists from various research institutions. The primary industrial partners are BAE Systems Inc. in Boulder, Colorado; L3Harris Technologies in Rochester, New York; and Teledyne Scientific & Imaging in Thousand Oaks, California.
      By Ashley Balzer
      NASA’s Goddard Space Flight Center, Greenbelt, Md.
      ​​Media Contact:
      Claire Andreoli
      NASA’s Goddard Space Flight Center
      301-286-1940
      Share
      Details
      Last Updated May 07, 2025 EditorAshley BalzerContactAshley Balzerashley.m.balzer@nasa.govLocationNASA Goddard Space Flight Center Related Terms
      Nancy Grace Roman Space Telescope Goddard Space Flight Center Technology Explore More
      6 min read NASA’s Roman Mission Shares Detailed Plans to Scour Skies
      Article 2 weeks ago 6 min read Team Preps to Study Dark Energy via Exploding Stars With NASA’s Roman
      Article 2 months ago 6 min read How NASA’s Roman Space Telescope Will Illuminate Cosmic Dawn
      Article 10 months ago View the full article
  • Check out these Videos

×
×
  • Create New...