Jump to content

Countdown to Psyche: Marshall Aids Preparations for Asteroid Mission, Key Technology Payload


Recommended Posts

  • Publishers
Posted

5 min read

Countdown to Psyche: Marshall Aids Preparations for Asteroid Mission, Key Technology Payload

By Rick Smith

When the Psyche spacecraft lifts off Oct. 5 to rendezvous with a distant, metal-rich asteroid – and test an innovative new communications system on the way – management teams at NASA’s Marshall Space Flight Center will be watching keenly.

Psyche is the 14th planetary exploration mission in NASA’s Discovery program, which is managed for the agency by Marshall – as is the TDM (Technology Demonstration Missions) program, which funds the DSOC (Deep Space Optical Communications) project.

Brad Zavodsky, left, Psyche mission manager in Marshalls Planetary Missions Program Office, and Joel Robinson, Deep Space Optical Communications mission manager at Marshall, ponder a scale model of the Psyche spacecraft.
Brad Zavodsky, left, Psyche mission manager in Marshall’s Planetary Missions Program Office, and Joel Robinson, Deep Space Optical Communications mission manager at Marshall, ponder a scale model of the Psyche spacecraft, which will be launched Oct. 5 on a mission to study a metal-rich asteroid deep in our solar system and will test innovative laser-based communications during the spacecraft’s transit around the Sun.
Credits: NASA/Mick Speer

“We ensure the project teams have all the resources they need to execute the project, monitor costs and schedules to keep the project on track and on time, and work closely with the payload and launch teams throughout the flight mission,” said Brad Zavodsky, Psyche mission manager in Marshall’s Planetary Missions Program Office.

Joel Robinson, DSOC mission manager at Marshall, concurs. He and Zavodsky serve as “conduits,” he said, between directorate-level technology and science leadership at NASA Headquarters and the Psyche and DSOC project leadership – both of which, serendipitously, are managed at NASA’s Jet Propulsion Laboratory.

The program office teams at Marshall include program planning and control personnel, independent technical authorities, and procurement and acquisition specialists. These technical experts provide the Psyche and DSOC missions with all necessary guidance and direction throughout their respective development and programmatic life cycles.

“That means a number of presentations, weekly telecons, and periodic reviews,” Robinson said, “but it’s all worth it as we count down to launch. All that oversight helps facilitate delivery of a robust payload – one that’s ready for launch and ready to extend humanity’s reach into the solar system.”

Led by principal investigator Dr. Lindy Elkins-Tanton at Arizona State University, Psyche is set to be lofted to space on a SpaceX Falcon Heavy – the first interplanetary launch of that rocket – from NASA’s Kennedy Space Center at 9:34 a.m. CDT on Oct. 5.

Powered by solar electric propulsion, Psyche’s flight to the asteroid will take six years; it will reach its destination in 2029 and begin a 26-month period of scheduled scientific observations, gathering images and data to shed new light on the asteroid’s history and composition.

The Psyche asteroid, orbiting the Sun in the asteroid belt between Mars and Jupiter, measures roughly 173 miles at its widest point. Researchers are keen to determine whether it may have been the core of a planetesimal, part of an early planet.

“We know a good deal about Earth’s core, but we can’t study it directly because of its depth below the crust and mantle,” Zavodsky said. “Investigating Psyche is perhaps the closest we can come. Studying its composition and structure is an exciting opportunity to learn more about such objects in space – and perhaps a little something about our own planet as well.”

Should the Psyche spacecraft encounter challenges during flight, Zavodsky’s team will assist mission managers at JPL and Arizona State University, for whom Marshall oversees the project management and principal investigator contracts.

“We’ll maintain direct engagement with the project team and NASA decision-making authorities,” he said. “Should an issue arise, the project will be prepared to stand up anomaly response teams to understand and resolve those challenges. Our program office will support that effort as needed.”

Meanwhile, the DSOC technology demonstrator is set to pursue its own mission, sending and receiving test data from Earth using a near-invisible infrared laser and sensitive photon-counting camera. It will mark NASA’s farthest-ever test of high-bandwidth optical communications – paving the way for broadband communications when NASA sends astronauts to Mars.

“We’re tackling the twin issues of bandwidth and transmission rate to expand and refine our data-gathering ability from missions beyond the Moon,” Robinson said. “We can’t transmit data faster than the speed of light, but we can do far more with advanced optical systems of the same size and power requirements as traditional radio systems.”

Building on the Lunar Laser Communications Demonstration mission flown on the International Space Station in 2013 and the Laser Communications Relay Demonstration, launched to geostationary orbit above Earth in 2021, the DSOC effort is the first to experiment with ultra-long-range, laser-based communications.

“It’s exciting to take optical communications capabilities into deep space for the first time,” Robinson said.

DSOC could deliver 10 to 100 times the data current radio systems are capable of transmitting, with far greater precision and clarity.

Joel Robinson

Joel Robinson

DSOC mission manager at Marshall

DSOC will test its optical transmission capabilities at and beyond a range of 1 astronomical unit, which is about 93 million miles – or the distance from the Sun to Earth. Psyche proves to be the perfect means to that end, requiring a gravity-assisting pass around the Sun in order to accelerate on its journey to the Psyche asteroid.

JPL laser researchers in California will send optical data to the DSOC payload during pre-conjunction – the period before the spacecraft is blocked by the Sun itself – and again during post-conjunction.

Smith, a Manufacturing Technical Solutions employee, supports the Marshall Office of Communications.

Share

Details

Last Updated
Sep 28, 2023

Related Terms

View the full article

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Similar Topics

    • By NASA
      One half of NASA’s nearly complete Nancy Grace Roman Space Telescope just passed a lengthy test to ensure it will function properly in the space environment. This milestone keeps Roman well on track for its target launch by May 2027, with the team aiming for as early as fall 2026.
      This photo shows half of the NASA’s Nancy Grace Roman observatory — the outer barrel assembly, deployable aperture cover, and test solar arrays — fully deployed in a thermal chamber at NASA’s Goddard Space Flight Center in Greenbelt, Md., for environmental testing. Credit: NASA/Sydney Rohde “This milestone tees us up to attach the flight solar array sun shield to the outer barrel assembly, and deployable aperture cover, which we’ll begin this month,” said Jack Marshall, who leads integration and testing for these elements at NASA’s Goddard Space Flight Center in Greenbelt, Maryland. “Then we’ll complete remaining environmental tests for the flight assembly before moving on to connect Roman’s two major assemblies and run the full observatory through testing, and then we’ll be ready to launch!”
      Prior to this thermal testing, technicians integrated Roman’s deployable aperture cover, a visor-like sunshade, to the outer barrel assembly, which will house the telescope and instruments, in January, then added test solar panels in March. They moved this whole structure into the Space Environment Simulator test chamber at NASA Goddard in April.
      There, it was subjected to the hot and cold temperatures it will experience in space. Next, technicians will join Roman’s flight solar panels to the outer barrel assembly and sunshade. Then the structure will undergo a suite of assessments, including a shake test to ensure it can withstand the vibrations experienced during launch.
      This photo captures the installation of the test solar panels for NASA’s Nancy Grace Roman Space Telescope, which took place in March. One panel is lifted in the center of the frame on its way to being attached to the outer barrel assembly at right. The deployable aperture cover is stowed on the front of the outer barrel assembly, and the other half of the observatory — the spacecraft and integrated payload assembly, which consists of the telescope, instrument carrier, and two instruments — appears at the left of the photo.Credit: NASA/Jolearra Tshiteya Meanwhile, Roman’s other major portion — the spacecraft and integrated payload assembly, which consists of the telescope, instrument carrier, and two instruments — will undergo its own shake test, along with additional assessments. Technicians will install the lower instrument sun shade and put this half of the observatory through a thermal vacuum test in the Space Environment Simulator.
      “The test verifies the instruments will remain at stable operating temperatures even while the Sun bakes one side of the observatory and the other is exposed to freezing conditions — all in a vacuum, where heat doesn’t flow as readily as it does through air,” said Jeremy Perkins, an astrophysicist serving as Roman’s observatory integration and test scientist at NASA Goddard. Keeping the instrument temperatures stable ensures their readings will be precise and reliable.
      Technicians are on track to connect Roman’s two major parts in November, resulting in a complete observatory by the end of the year. Following final tests, Roman is expected to ship to the launch site at NASA’s Kennedy Space Center in Florida for launch preparations in summer 2026. Roman remains on schedule for launch by May 2027, with the team aiming for launch as early as fall 2026.
      This infographic shows the two major subsystems that make up NASA’s Nancy Grace Roman Space Telescope. The subsystems are each undergoing testing prior to being joined together this fall.Credit: NASA’s Goddard Space Flight Center To virtually tour an interactive version of the telescope, visit:
      https://roman.gsfc.nasa.gov/interactive
      The Nancy Grace Roman Space Telescope is managed at NASA’s Goddard Space Flight Center in Greenbelt, Maryland, with participation by NASA’s Jet Propulsion Laboratory in Southern California; Caltech/IPAC in Pasadena, California; the Space Telescope Science Institute in Baltimore; and a science team comprising scientists from various research institutions. The primary industrial partners are BAE Systems Inc. in Boulder, Colorado; L3Harris Technologies in Rochester, New York; and Teledyne Scientific & Imaging in Thousand Oaks, California.
      By Ashley Balzer
      NASA’s Goddard Space Flight Center, Greenbelt, Md.
      ​​Media Contact:
      Claire Andreoli
      NASA’s Goddard Space Flight Center
      301-286-1940
      Share
      Details
      Last Updated May 07, 2025 EditorAshley BalzerContactAshley Balzerashley.m.balzer@nasa.govLocationNASA Goddard Space Flight Center Related Terms
      Nancy Grace Roman Space Telescope Goddard Space Flight Center Technology Explore More
      6 min read NASA’s Roman Mission Shares Detailed Plans to Scour Skies
      Article 2 weeks ago 6 min read Team Preps to Study Dark Energy via Exploding Stars With NASA’s Roman
      Article 2 months ago 6 min read How NASA’s Roman Space Telescope Will Illuminate Cosmic Dawn
      Article 10 months ago View the full article
    • By NASA
      Technicians move the Orion spacecraft for NASA’s Artemis II test flight out of the Neil A. Armstrong Operations and Checkout Building to the Multi-Payload Processing Facility at Kennedy Space Center in Florida on Saturday, May 3, 2025. NASA/Kim Shiflett Engineers, technicians, mission planners, and the four astronauts set to fly around the Moon next year on Artemis II, NASA’s first crewed Artemis mission, are rapidly progressing toward launch.

      At the agency’s Kennedy Space Center in Florida, teams are working around the clock to move into integration and final testing of all SLS (Space Launch System) and Orion spacecraft elements. Recently they completed two key milestones – connecting the SLS upper stage with the rest of the assembled rocket and moving Orion from its assembly facility to be fueled for flight.

      “We’re extremely focused on preparing for Artemis II, and the mission is nearly here,” said Lakiesha Hawkins, assistant deputy associate administrator for NASA’s Moon to Mars Program, who also will chair the mission management team during Artemis II. “This crewed test flight, which will send four humans around the Moon, will inform our future missions to the Moon and Mars.”
      Teams with NASA’s Exploration Ground Systems Program begin integrating the interim cryogenic propulsion stage to the SLS (Space Launch System) launch vehicle stage adapter on Wednesday, April 30, 2025, inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. NASA/Isaac Watson On May 1, technicians successfully attached the interim cryogenic propulsion stage to the SLS rocket elements already poised atop mobile launcher 1, including its twin solid rocket boosters and core stage, inside the spaceport’s Vehicle Assembly Building (VAB). This portion of the rocket produces 24,750 pounds of thrust for Orion after the rest of the rocket has completed its job. Teams soon will move into a series of integrated tests to ensure all the rocket’s elements are communicating with each other and the Launch Control Center as expected. The tests include verifying interfaces and ensuring SLS systems work properly with the ground systems.

      Meanwhile, on May 3, Orion left its metaphorical nest, the Neil Armstrong Operations & Checkout Facility at Kennedy, where it was assembled and underwent initial testing. There the crew module was outfitted with thousands of parts including critical life support systems for flight and integrated with the service module and crew module adapter. Its next stop on the road to the launch pad is the Multi-Payload Processing Facility, where it will be carefully fueled with propellants, high pressure gases, coolant, and other fluids the spacecraft and its crew need to maneuver in space and carry out the mission.

      After fueling is complete, the four astronauts flying on the mission around the Moon and back over the course of approximately 10 days, will board the spacecraft in their Orion Crew Survival System spacesuits to test all the equipment interfaces they will need to operate during the mission. This will mark the first time NASA’s Reid Wiseman, Victor Glover, and Christina Koch, and CSA (Canadian Space Agency) astronaut Jeremy Hansen, will board their actual spacecraft while wearing their spacesuits. After the crewed testing is complete, technicians will move Orion to Kennedy’s Launch Abort System Facility, where the critical escape system will be added. From there, Orion will move to the VAB to be integrated with the fully assembled rocket.

      NASA also announced its second agreement with an international space agency to fly a CubeSat on the mission. The collaborations provide opportunities for other countries to work alongside NASA to integrate and fly technology and experiments as part of the agency’s Artemis campaign.

      While engineers at Kennedy integrate and test hardware with their eyes on final preparations for the mission, teams responsible for launching and flying the mission have been busy preparing for a variety of scenarios they could face.

      The launch team at Kennedy has completed more than 30 simulations across cryogenic propellant loading and terminal countdown scenarios. The crew has been taking part in simulations for mission scenarios, including with teams in mission control. In April, the crew and the flight control team at NASA’s Johnson Space Center in Houston simulated liftoff through a planned manual piloting test together for the first time. The crew also recently conducted long-duration fit checks for their spacesuits and seats, practicing several operations while under various suit pressures.
      NASA astronaut Christina Koch participates in a fit check April 18, 2025, in the spacesuit she will wear during Artemis II. NASA/Josh Valcarcel Teams are heading into a busy summer of mission preparations. While hardware checkouts and integration continue, in coming months the crew, flight controllers, and launch controllers will begin practicing their roles in the mission together as part of integrated simulations. In May, the crew will begin participating pre-launch operations and training for emergency scenarios during launch operations at Kennedy and observe a simulation by the launch control team of the terminal countdown portion of launch. In June, recovery teams will rehearse procedures they would use in the case of a pad or ascent abort off the coast of Florida, with launch and flight control teams supporting. The mission management team, responsible for reviewing mission status and risk assessments for issues that arise and making decisions about them, also will begin practicing their roles in simulations. Later this summer, the Orion stage adapter will arrive at the VAB from NASA’s Marshall Spaceflight Center in Huntsville, Alabama, and stacked on top of the rocket.

      NASA astronauts Reid Wiseman (foreground) and Victor Glover participate in a simulation of their Artemis II entry profile on March 13, 2025.NASA/Bill Stafford Through Artemis, NASA will send astronauts to explore the Moon for scientific discovery, economic benefits, and build the foundation for the first crewed missions to Mars.
      View the full article
    • By NASA
      Landing on the Moon is not easy, particularly when a crew or spacecraft must meet exacting requirements. For Artemis missions to the lunar surface, those requirements include an ability to land within an area about as wide as a football field in any lighting condition amid tough terrain.

      NASA’s official lunar landing requirement is to be able to land within 50 meters (164 feet) of the targeted site and developing precision tools and technologies is critically important to mission success.

      NASA engineers recently took a major step toward safe and precise landings on the Moon – and eventually Mars and icy worlds – with a successful field test of hazard detection technology at NASA’s Kennedy Space Center Shuttle Landing Facility in Florida.

      A joint team from the Aeroscience and Flight Mechanics Division at NASA’s Johnson Space Center’s in Houston and Goddard Space Flight Center in Greenbelt, Maryland, achieved this huge milestone in tests  of the Goddard Hazard Detection Lidar from a helicopter at Kennedy in March 2025. 

      NASA’s Hazard Detection Lidar field test team at Kennedy Space Center’s Shuttle Landing Facility in Florida in March 2025. NASA The new lidar system is one of several sensors being developed as part of NASA’s Safe & Precise Landing – Integrated Capabilities Evolution (SPLICE) Program, a Johnson-managed cross-agency initiative under the Space Technology Mission Directorate to develop next-generation landing technologies for planetary exploration. SPLICE is an integrated descent and landing system composed of avionics, sensors, and algorithms that support specialized navigation, guidance, and image processing techniques. SPLICE is designed to enable landing in hard-to-reach and unknown areas that are of potentially high scientific interest.

      The lidar system, which can map an area equivalent to two football fields in just two seconds, is a crucial program component. In real time and compensating for lander motion, it processes 15 million short pulses of laser light to quickly scan surfaces and create real-time, 3D maps of landing sites to support precision landing and hazard avoidance. 

      Those maps will be read by the SPLICE Descent and Landing Computer, a high-performance multicore computer processor unit that analyzes all SPLICE sensor data and determines the spacecraft’s velocity, altitude, and terrain hazards. It also computes the hazards and determines a safe landing location. The computer was developed by the Avionics Systems Division at Johnson as a platform to test navigation, guidance, and flight software. It previously flew on Blue Origin’s New Shepard booster rocket.

      The NASA team prepares the Descent and Landing Computer for Hazard Detection Lidar field testing at Kennedy Space Center. NASA For the field test at Kennedy, Johnson led test operations and provided avionics and guidance, navigation, and control support. Engineers updated the computer’s firmware and software to support command and data interfacing with the lidar system. Team members from Johnson’s Flight Mechanics branch also designed a simplified motion compensation algorithm and NASA’s Jet Propulsion Laboratory in Southern California contributed a hazard detection algorithm, both of which were added to the lidar software by Goddard. Support from NASA contractors Draper Laboratories and Jacobs Engineering played key roles in the test’s success.

      Primary flight test objectives were achieved on the first day of testing, allowing the lidar team time to explore different settings and firmware updates to improve system performance. The data confirmed the sensor’s capability in a challenging, vibration-heavy environment, producing usable maps. Preliminary review of the recorded sensor data shows excellent reconstruction of the hazard field terrain.

      A Hazard Detection Lidar scan of a simulated hazard field at Kennedy Space Center (left) and a combined 3D map identifying roughness and slope hazards. NASA Beyond lunar applications, SPLICE technologies are being considered for use on Mars Sample Return, the Europa Lander, Commercial Lunar Payload Services flights, and Gateway. The DLC design is also being evaluated for potential avionics upgrades on Artemis systems.

      Additionally, SPLICE is supporting software tests for the Advancement of Geometric Methods for Active Terrain Relative Navigation (ATRN) Center Innovation Fund project, which is also part of Johnson’s Aeroscience and Flight Mechanics Division. The ATRN is working to develop algorithms and software that can use data from any active sensor – one measuring signals that were reflected, refracted, or scattered by a body’s surface or its atmosphere – to accurately map terrain and provide absolute and relative location information. With this type of system in place, spacecraft will not need external lighting sources to find landing sites.

      With additional suborbital flight tests planned through 2026, the SPLICE team is laying the groundwork for safer, more autonomous landings on the Moon, Mars, and beyond. As NASA prepares for its next era of exploration, SPLICE will be a key part of the agency’s evolving landing, guidance, and navigation capabilities.
      Explore More
      2 min read NASA Gathers Experts to Discuss Emerging Technologies in Astrophysics
      Article 2 hours ago 2 min read NASA Technology Enables Leaps in Artificial Intelligence
      Artificial intelligence lets machines communicate autonomously
      Article 2 hours ago 3 min read In the Starlight: Jason Phillips’ Unexpected Path to Johnson Procurement
      Article 7 hours ago View the full article
    • By NASA
      Intuitive Machines’ IM-2 captured an image March 6, 2025, after landing in a crater from the Moon’s South Pole. The lunar lander is on its side near the intended landing site, Mons Mouton. In the center of the image between the two lander legs is the Polar Resources Ice Mining Experiment 1 suite, which shows the drill deployed.Intuitive Machines NASA’s PRIME-1 (Polar Resources Ice Mining Experiment 1) mission was designed to demonstrate technologies to help scientists better understand lunar resources ahead of crewed Artemis missions to the Moon. During the short-lived mission on the Moon, the performance of PRIME-1’s technology gave NASA teams reason to celebrate.  
      “The PRIME-1 mission proved that our hardware works in the harshest environment we’ve ever tested it in,” said Janine Captain, PRIME-1 co-principal investigator and research chemist at NASA’s Kennedy Space Center in Florida. “While it may not have gone exactly to plan, this is a huge step forward as we prepare to send astronauts back to the Moon and build a sustainable future there.” 
      Intuitive Machines’ IM-2 mission launched to the Moon on Feb. 26, 2025, from NASA Kennedy’s Launch Complex 39A, as part of the company’s second Moon delivery for NASA under the agency’s CLPS (Commercial Lunar Payload Services) initiative and Artemis campaign. The IM-2 Nova-C lunar lander, named Athena, carried PRIME-1 and its suite of two instruments: a drill known as TRIDENT (The Regolith and Ice Drill for Exploring New Terrain), designed to bring lunar soil to the surface; and a mass spectrometer, Mass Spectrometer Observing Lunar Operations (MSOLO), to study TRIDENT’s drill cuttings for the presence of gases that could one day help provide propellant or breathable oxygen to future Artemis explorers.  
      The IM-2 mission touched down on the lunar surface on March 6, just around 1,300 feet (400 meters) from its intended landing site of Mons Mouton, a lunar plateau near the Moon’s South Pole. The Athena lander was resting on its side inside a crater preventing it from recharging its solar cells, resulting in an end of the mission.
      “We were supposed to have 10 days of operation on the Moon, and what we got was closer to 10 hours,” said Julie Kleinhenz, NASA’s lead systems engineer for PRIME-1, as well as the in-situ resource utilization system capability lead deputy for the agency. “It was 10 hours more than most people get so I am thrilled to have been a part of it.” 
      Kleinhenz has spent nearly 20 years working on how to use lunar resources for sustained operations. In-situ resource utilization harnesses local natural resources at mission destinations. This enables fewer launches and resupply missions and significantly reduces the mass, cost, and risk of space exploration. With NASA poised to send humans back to the Moon and on to Mars, generating products for life support, propellants, construction, and energy from local materials will become increasingly important to future mission success.  
      “In-situ resource utilization is the key to unlocking long-term exploration, and PRIME-1 is helping us lay this foundation for future travelers.” Captain said.
      The PRIME-1 technology also set out to answer questions about the properties of lunar regolith, such as soil strength. This data could help inform the design of in-situ resource utilization systems that would use local resources to create everything from landing pads to rocket fuel during Artemis and later missions.  
      “Once we got to the lunar surface, TRIDENT and MSOLO both started right up, and performed perfectly. From a technology demonstrations standpoint, 100% of the instruments worked.” Kleinhenz said.
      The lightweight, low-power augering drill built by Honeybee Robotics, known as TRIDENT, is 1 meter long and features rotary and percussive actuators that convert energy into the force needed to drill. The drill was designed to stop at any depth as commanded from the ground and deposit its sample on the surface for analysis by MSOLO, a commercial off-the-shelf mass spectrometer modified by engineers and technicians at NASA Kennedy to withstand the harsh lunar environment. Designed to measure the composition of gases in the vicinity of the lunar lander, both from the lander and from the ambient exosphere, MSOLO can help NASA analyze the chemical makeup of the lunar soil and study water on the surface of the Moon.  
      Once on the Moon, the actuators on the drill performed as designed, completing multiple stages of movement necessary to drill into the lunar surface. Prompted by commands from technicians on Earth, the auger rotated, the drill extended to its full range, the percussion system performed a hammering motion, and the PRIME-1 team turned on an embedded core heater in the drill and used internal thermal sensors to monitor the temperature change.
      While MSOLO was able to perform several scans to detect gases, researchers believe from the initial data that the gases detected were all anthropogenic, or human in origin, such as gases vented from spacecraft propellants and traces of Earth water. Data from PRIME-1 accounted for some of the approximately 7.5 gigabytes of data collected during the IM-2 mission, and researchers will continue to analyze the data in the coming months and publish the results.
      View the full article
    • By NASA
      2 min read
      Preparations for Next Moonwalk Simulations Underway (and Underwater)
      Multinational corporations are using the M2M Intelligence platform in data centers and other settings. The system offers automated, secure communications on a ground-based global 5G network. Getty Images Artificial intelligence (AI) is advancing rapidly, as intelligent software proves capable of various tasks. The technology usually requires a “human in the loop” to train it and ensure accuracy. But long before the arrival of today’s generative artificial intelligence, a different kind of AI was born with the help of NASA’s Ames Research Center in California’s Silicon Valley — one that only exists between machines, running without any human intervention.

      In 2006, Geoffrey Barnard founded Machine-to-Machine Intelligence Corp. (M2Mi) at Ames’ NASA Research Park, envisioning an automated, satellite-based communication network. NASA Ames established a Space Act Agreement with the company to develop artificial intelligence that would automate communications, privacy, security, and resiliency between satellites and ground-based computers.

      Central to the technology was automating a problem-solving approach known as root cause analysis, which NASA has honed over decades. This methodology seeks to identify not only the immediate cause of a problem but also all the factors that contributed to the cause. This would allow a network to identify its own issues and fix itself. 

      NASA Ames’ director of nanotechnology at the time wanted to develop a communications network based on small, low-powered satellites, so Ames supported M2Mi in developing the necessary technology. 
      Barnard, now CEO and chief technology officer of Tiburon, California-based branch of M2Mi, said NASA’s support laid the foundation for his company, which employs the same technology in a ground-based network. 
      The company’s M2M Intelligence software performs secure, resilient, automated communications on a system that runs across hundreds of networks, connecting thousands of devices, many of which were not built to communicate with each other. The M2Mi company worked with Vodafone of Berkshire, England, to build a worldwide network across more than 500 smaller networks in over 190 countries. The companies M2M Wireless and TriGlobal have begun using M2M Intelligence for transportation logistics. 
      With NASA’s help, emerging industries are getting the boost they need to rapidly develop technologies to enhance our lives. 
      Read More Share
      Details
      Last Updated Apr 29, 2025 Related Terms
      Technology Transfer & Spinoffs Spinoffs Technology Transfer Explore More
      2 min read NASA Engineering Sparks Innovative New Battery 
      Nickel-hydrogen technology is safe, durable, and long-lasting – now it’s affordable too.
      Article 5 days ago 2 min read NASA Tech Developed for Home Health Monitoring  
      Article 3 weeks ago 2 min read NASA Cloud Software Helps Companies Find their Place in Space 
      Article 1 month ago Keep Exploring Discover Related Topics
      Missions
      Artificial Intelligence for Science
      NASA is creating artificial intelligence tools to help researchers use NASA’s science data more effectively.
      Ames Research Center
      Solar System
      View the full article
  • Check out these Videos

×
×
  • Create New...